TEXAS · WELLS · PANOLA COUNTY · SHARP-SMITH UNIT LEASE · API 42-365-33359 · DISTRICT 06

Sharp-Smith Unit #4

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Sharp-Smith Unit #4 (API 42-365-33359) is a well in Panola County operated by Tgnr Panola LLC, completed August 27, 1996 and listed as temp abandoned on the RRC schedule, shut in September 1, 2023.

The RRC has issued one drilling permit, issued March 22, 1996, permitted to 10,245 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.

Its lease has reported 4 barrels of oil and 1.32M mcf of gas since August 1996, last reporting volume in August 2023.

Operator of record

TGNR Panola LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsTGNR Panola LLCthrough Aug 2023
Latest permitTexaco E & P Inc.Mar 22, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,245
total depth, ft
1
permits on file
Mar 22, 1996
last permit issued
Aug 27, 1996
completed
4
cumulative oil, bbl
1.32M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1996 THROUGH Aug 2023

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 27, 1996
Shut in
Sep 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sharp-Smith Unit G-6-160082Carthage (Cotton Valley)TGNR Panola LLC141.32MAug 1996 – Aug 2023

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Aug 1996 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Aug 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446158-99DrillTexaco E & P Inc.Mar 21, 1996Mar 22, 1996Jul 11, 199610,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 27, 1996Sharp-Smith Unit G-6-160082Carthage (Cotton Valley)TGNR Panola LLCTemp Abandoned · shut in Sep 1, 202310,245

Formation tops

As filed on W-2/G-1. Subsea from 357 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,750-5,393
Pettit6,440-6,083
Travis Peak6,760-6,403
Cotton Valley8,803-8,446

Perforations

Perforated and open-hole intervals.

FromToType
8,8368,996Perforated
9,1029,260Perforated
9,3549,610Perforated
9,9169,932Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1685——
8.6251,00511400 S
2.87510,2457.8751,440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 29, 1996Sep 23, 1996Yes
00Oct 10, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533359, documented in the API reference.