TEXAS · WELLS · PANOLA COUNTY · API 42-365-33471 · DISTRICT 06

Smith Ella Unit 1 #7

Shut in

Panola County · Carthage (Travis Peak) field · Temp Abandoned  · Vertical

Smith Ella Unit 1 #7 (API 42-365-33471) is a well in Panola County operated by Tgnr East Texas LLC, completed May 10, 2001 and listed as temp abandoned on the RRC schedule, shut in October 1, 2025.

The RRC has issued one drilling permit, issued August 6, 1996, permitted to 9,400 ft.

It was permitted by Lacy, R., Inc. and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Glen Rose, BMA, Pettit.

Its 2 leases have reported 3.65K barrels of oil and 1.36M mcf of gas since October 1996, last reporting volume in September 2025. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

TGNR East Texas LLC

Permitted by Lacy, R., Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Feb 2026
Latest permitLacy, R., Inc.Aug 6, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,400
total depth, ft
1
permits on file
Aug 6, 1996
last permit issued
May 10, 2001
completed
3.65K
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH Feb 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 10, 2001
Shut in
Oct 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Ella Unit 1 G-6-160820Carthage (Cotton Valley)TGNR East Texas LLC13.29K642KOct 1996 – Feb 2026
Smith, Ella Unit 1 G-6-162153Carthage (Travis Peak)TGNR East Texas LLC1359719KJan 1997 – Dec 2021

Gas, mcf lease total

Last 12 months 1,288 · prior 12 3,579(-64%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lacy, R., Inc.Oct 1996 → Dec 1997
  2. 2Union Pacific Resources CompanyFeb 1998 → Jan 2001
  3. 3Rme Petroleum CompanyFeb 2001 → Nov 2002
  4. 4Anadarko E&P Company LPDec 2002 → Dec 2012
  5. 5Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  6. 6Cci East Texas Upstream LLCDec 2016 → Dec 2020
  7. 7TGNR East Texas LLCFeb 2021 → Sep 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
451145-99DrillLacy, R., Inc.Aug 5, 1996Aug 6, 1996Aug 17, 19969,450

Completions

CompletedLeaseFieldOperatorStatusDepth
May 10, 2001Smith Ella Unit 1 G-6-162153Carthage (Travis Peak)TGNR East Texas LLCTemp Abandoned · shut in Dec 1, 20219,400
Feb 24, 1998Smith Ella Unit 1 G-6-160820Carthage (Cotton Valley)TGNR East Texas LLCTemp Abandoned · shut in Oct 1, 20259,400

Formation tops

As filed on W-2/G-1. Subsea from 222 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkBASE/AUSTIN CHALK2,446-2,224
Glen Rose3,190-2,968
BMA4,894-4,672
Pettit5,668-5,446
Travis Peak6,054-5,832
Cotton Valley8,193-7,971

Perforations

Perforated and open-hole intervals.

FromToType
6,2046,222Perforated
6,2366,242Perforated
6,7926,797Perforated
8,3808,400Perforated
9,0409,051Perforated
9,0409,090Perforated
9,0559,070Perforated
9,0809,090Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,00514.75610 S
2.8757,0449.8751,400 S
4.59,3927.875530 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 28, 2002Dec 6, 2001—
00Dec 20, 2001Nov 29, 2001—
00Sep 11, 1998Jul 30, 1998—
00Apr 2, 1997Feb 24, 1997Yes
00Mar 31, 1997——
00Dec 20, 1996Nov 13, 1996Yes
00Dec 13, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533471, documented in the API reference.