TEXAS · WELLS · PANOLA COUNTY · WERNER-WHITE UNIT LEASE · API 42-365-33512 · DISTRICT 06

Werner-White Unit #5

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Werner-White Unit #5 (API 42-365-33512) is a well in Panola County operated by Tgnr Panola LLC, completed December 31, 1996 and listed as temp abandoned on the RRC schedule, shut in December 1, 2020.

The RRC has issued one drilling permit, issued October 4, 1996, permitted to 9,918 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Paluxy, Glen Rose, Rodessa, Travis Peak.

Its lease has reported 1.31K barrels of oil and 866K mcf of gas since December 1996, with no volume in the three years through April 2026.

Operator of record

TGNR Panola LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsTGNR Panola LLCthrough Nov 2020
Latest permitTexaco E & P Inc.Oct 4, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,918
total depth, ft
1
permits on file
Oct 4, 1996
last permit issued
Dec 31, 1996
completed
1.31K
cumulative oil, bbl
866K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH Nov 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 31, 1996
Shut in
Dec 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Werner-White Unit G-6-161537Carthage (Cotton Valley)TGNR Panola LLC11.31K866KDec 1996 – Nov 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Dec 1996 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Nov 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
453362-99DrillTexaco E & P Inc.Oct 2, 1996Oct 4, 1996Nov 3, 199610,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 31, 1996Werner-White Unit G-6-161537Carthage (Cotton Valley)TGNR Panola LLCTemp Abandoned · shut in Dec 1, 20209,918

Formation tops

As filed on W-2/G-1. Subsea from 228 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy2,970-2,742
Glen Rose3,282-3,054
Rodessa5,042-4,814
Travis Peak6,278-6,050
Cotton Valley8,822-8,594

Perforations

Perforated and open-hole intervals.

FromToType
8,8668,886Perforated
9,1109,130Perforated
9,7209,740Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1440——
9.6251,02712.25280 S
4.59,9187.8751,122 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 4, 1997Jan 23, 1997Yes
00Feb 25, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533512, documented in the API reference.