TEXAS · WELLS · PANOLA COUNTY · OWENS UNIT LEASE · API 42-365-33617 · DISTRICT 06

Owens Unit #10

Plugged

Panola County · Carthage (Cotton Valley) field  · Vertical

Owens Unit #10 (API 42-365-33617) is a plugged well in Panola County, plugged November 18, 2025, last operated by Tgnr East Texas II LLC.

The RRC has issued one drilling permit, issued February 28, 1997, permitted to 9,350 ft.

It was permitted by Pennzoil Exploration & Prod. CO. and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Tma, BMA, Rodessa, Sligo.

Its lease has reported 8.85K barrels of oil and 992K mcf of gas since August 1997, with no volume in the three years through April 2026.

Operator of record

TGNR East Texas II LLC

Permitted by Pennzoil Exploration & Prod. Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2026
Permits on file
162
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas II LLC
Production reportsTGNR East Texas II LLCthrough Sep 2023
Latest permitPennzoil Exploration & Prod. Co.Feb 28, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,350
total depth, ft
1
permits on file
Feb 28, 1997
last permit issued
Aug 7, 1997
completed
8.85K
cumulative oil, bbl
992K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1997 THROUGH Sep 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 7, 1997
Shut in
—
Plugged
Nov 18, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Owens Unit G-6-164601Carthage (Cotton Valley)TGNR East Texas II LLC18.85K992KAug 1997 – Sep 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Exploration & Prod. Co.Aug 1997 → Dec 1998
  2. 2Samson Lone Star LPJan 1999 → Jun 2007
  3. 3Samson Lone Star, LLCJul 2007 → Sep 2017
  4. 4Rockcliff Energy Operating LLCOct 2017 → Aug 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
459062-99DrillPennzoil Exploration & Prod. Co.Feb 24, 1997Feb 28, 1997Jul 6, 19979,350

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 7, 1997Owens Unit G-6-164601Carthage (Cotton Valley)TGNR East Texas II LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 259 ft elevation.Download CSV →

FormationMD ftSubsea
Tma4,670-4,411
BMA4,950-4,691
Rodessa5,020-4,761
Sligo5,850-5,591
Travis Peak6,010-5,751
Cotton Valley8,200-7,941

Perforations

Perforated and open-hole intervals.

FromToType
9,1809,220Perforated
9,2549,284Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,02511330 S
2.8759,3277.8752,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 10, 1997Aug 27, 1997Yes
00Oct 6, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533617, documented in the API reference.