TEXAS · WELLS · PANOLA COUNTY · BRASHER, J. D. UNIT LEASE · API 42-365-33758 · DISTRICT 06

Brasher J. D. Unit #12

Y

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Brasher J. D. Unit #12 (API 42-365-33758) is a well in Panola County operated by Tgnr Panola LLC, completed December 5, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 16, 1997, permitted to 10,050 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Cotton Valley.

Its lease has reported 195 barrels of oil and 1.6M mcf of gas since December 1997, last reporting volume in April 2026.

Operator of record

TGNR Panola LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsTGNR Panola LLCthrough Apr 2026
Latest permitTexaco E & P Inc.Sep 16, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,050
total depth, ft
1
permits on file
Sep 16, 1997
last permit issued
Dec 5, 1997
completed
195
cumulative oil, bbl
1.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1998 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 5, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brasher, J. D. Unit G-6-167186Carthage (Cotton Valley)TGNR Panola LLC11951.6MDec 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 13,238 · prior 12 21,448(-38%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1998 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Mar 2025
  3. 3TGNR Panola LLCApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
466955-99DrillTexaco E & P Inc.Aug 29, 1997Sep 16, 1997Oct 29, 199710,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 5, 1997Brasher J. D. Unit G-6-167186Carthage (Cotton Valley)TGNR Panola LLCProducing10,050

Formation tops

As filed on W-2/G-1. Subsea from 309 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,550-5,241
Pettit6,275-5,966
Travis Peak6,550-6,241
Cotton Valley8,712-8,403

Perforations

Perforated and open-hole intervals.

FromToType
8,7858,970Perforated
9,0609,230Perforated
9,8999,934Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
8.6251,04011400 S
2.87510,0257.8752,325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 15, 1998Jan 23, 1998Yes
00Mar 30, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36533758, documented in the API reference.