TEXAS · WELLS · PANOLA COUNTY · API 42-365-33885 · DISTRICT 06
Tillery Unit #5U
Panola County · Bethany (Travis Peak Cons.) field · Vertical
Tillery Unit #5U (API 42-365-33885) is a plugged well in Panola County, plugged August 17, 2012, last operated by Devon Energy Production CO L.P..
The RRC has issued 3 drilling permits (amended once) between 1998 and 2003, permitted to 9,900 ft.
Completion filings report 6 formation tops, including Paluxy, Glen Rose, BMA, Sligo.
Its 4 leases have reported 3.07K barrels of oil and 559K mcf of gas since September 1998, with no volume in the three years through April 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Devon Energy Production Co L.P.
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Dec 18, 2025
- Permits on file
- 9,266
- Phone
- (405) 235-3611
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Devon Energy Production Co L.P. |
| Production reports | Devon Energy Production Co, L.P.through May 2008 |
| Latest permit | Devon Energy Production Co, L.P.Jun 5, 2003 |
- 9,900
- total depth, ft
- 4
- permits on file
- Jun 5, 2003
- last permit issued
- May 4, 2004
- completed
- 3.07K
- cumulative oil, bbl
- 559K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1998 THROUGH May 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 4, 2004
- Shut in
- —
- Plugged
- Aug 17, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tillery Unit G-6-170503 | Bethany, East (Cotton Valley) | Devon Energy Production Co, L.P. | 1 | 2.35K | 433K | Sep 1998 – May 2008 |
| Tillery Unit G-6-189239 | Bethany (Travis Peak 6300, Gas) | Devon Energy Production Co, L.P. | 1 | 100 | 12.3K | May 2002 – Oct 2002 |
| Tillery Unit G-6-171017 | Bethany (Travis Peak Cons.) | Devon Energy Production Co, L.P. | 1 | 619 | 113K | Sep 1998 – Sep 2001 |
| Tillery Unit G-6-202053 | Bethany (Travis Peak Cons.) | Devon Energy Production Co, L.P. | 1 | 0 | 0 | May 2004 – — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pennzoil Exploration & Prod. Co.Sep 1998 → Feb 1999
- 2Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
- 3Devon Energy Production Co, L.P.Apr 2000 → May 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 532468-99 | Recompletion | Devon Energy Production Co, L.P. | May 28, 2003 | Jun 5, 2003 | Mar 5, 2004 | 6,380 |
| 498455-99 | Recompletion | Devon Energy Production Co, L.P. | Aug 14, 2000 | Aug 15, 2000 | May 16, 2002 | 8,067 |
| 473288-98 | Drill | Pennzoil Exploration & Prod. Co. | Sep 11, 1998 | Feb 19, 1998 | — | 9,900 |
| 473288-99 | Drill | Pennzoil Exploration & Prod. Co. | Feb 12, 1998 | Feb 19, 1998 | Jul 17, 1998 | 9,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 4, 2004 | Tillery Unit G-6-202053 | Bethany (Travis Peak Cons.) | Devon Energy Production Co L.P. | Plugged | — |
| May 18, 2002 | Tillery Unit G-6-189239 | Bethany (Travis Peak 6300 Gas) | Devon Energy Production Co L.P. | Plugged | — |
| Jun 9, 1999 | Tillery Unit G-6-171017 | Bethany (Travis Peak Cons.) | Devon Energy Production Co L.P. | Plugged | — |
| Sep 24, 1998 | Tillery Unit G-6-170503 | Bethany East (Cotton Valley) | Devon Energy Production Co L.P. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 303 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 2,664 | -2,361 |
| Glen Rose | 3,004 | -2,701 |
| BMA | 4,744 | -4,441 |
| Sligo | 5,568 | -5,265 |
| Travis Peak | 5,919 | -5,616 |
| Cotton Valley | 8,122 | -7,819 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,006 | 6,019 | Perforated |
| 6,299 | 6,313 | Perforated |
| 6,428 | 6,438 | Perforated |
| 9,180 | 9,193 | Perforated |
| 9,196 | 9,206 | Perforated |
| 9,223 | 9,228 | Perforated |
| 9,569 | 9,589 | Perforated |
| 9,603 | 9,618 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,826 | 12.25 | 317 S |
| 2.875 | 8,069 | 8.75 | 1,700 S |
| 2.875 | 9,745 | 7.875 | 625 S |
| 2.875 | 9,745 | 8.75 | 2,325 S |
| — | 9,745 | 8.75 | 625 S |
| — | 9,745 | — | 625 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 12, 2004 | May 17, 2004 | Yes |
| 00 | Jul 12, 2004 | — | — |
| 00 | Jul 30, 2002 | Jun 14, 2002 | Yes |
| 00 | Jul 11, 2002 | — | — |
| 00 | Jul 14, 1999 | Jun 22, 1999 | — |
| 00 | Dec 22, 1998 | Oct 26, 1998 | Yes |
| 00 | Dec 22, 1998 | Oct 23, 1998 | — |
| 00 | Dec 10, 1998 | — | — |
| 00 | Nov 12, 1998 | Oct 1, 1998 | Yes |
| 00 | Nov 2, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-33885 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-33885 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36533885, documented in the API reference.