TEXAS · WELLS · PANOLA COUNTY · BEALL-NORMAN LEASE · API 42-365-34083 · DISTRICT 06

Beall-Norman #15

Y

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Beall-Norman #15 (API 42-365-34083) is a well in Panola County operated by Tgnr Panola LLC, completed December 15, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 4, 1999, permitted to 9,775 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Paluxy, Massive Anhydrite (marker), Rodessa, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Panola LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsTGNR Panola LLCthrough Apr 2026
Latest permitTexaco E & P Inc.Jan 4, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,775
total depth, ft
1
permits on file
Jan 4, 1999
last permit issued
Dec 15, 1999
completed
0
cumulative oil, bbl
1.71M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 15, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beall-Norman G-6-176206Carthage (Cotton Valley)TGNR Panola LLC101.71MDec 1999 – Jul 2026

Gas, mcf lease total

Last 12 months 7,349 · prior 12 7,610(-3%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 2000 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Mar 2025
  3. 3TGNR Panola LLCApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
481007-99DrillTexaco E & P Inc.Nov 19, 1998Jan 4, 1999Oct 21, 199910,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 15, 1999Beall-Norman G-6-176206Carthage (Cotton Valley)TGNR Panola LLCProducing9,775

Formation tops

As filed on W-2/G-1. Subsea from 241 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy3,260-3,019
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,980-4,739
Rodessa5,292-5,051
Travis Peak6,270-6,029
Cotton Valley8,258-8,017

Perforations

Perforated and open-hole intervals.

FromToType
8,5008,692Perforated
8,7448,915Perforated
8,9709,191Perforated
9,2559,413Perforated
9,6099,633Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
8.6251,02512.25625 S
4.59,7757.8752,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 19, 2000May 30, 2000—
00Apr 11, 2000Jan 26, 2000Yes
00Mar 28, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534083, documented in the API reference.