TEXAS · WELLS · PANOLA COUNTY · FLOYD GAS UNIT LEASE · API 42-365-34198 · DISTRICT 06

Floyd Gas Unit #11

Y

Panola County · Bethany East (Cotton Valley) field · Producing  · Vertical

Floyd Gas Unit #11 (API 42-365-34198) is a well in Panola County operated by Xto Energy Inc., completed November 12, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 3, 1999, permitted to 9,400 ft.

It was permitted by Fina Oil & Chemical Company and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.

Its lease has reported 12.7K barrels of oil and 1.26M mcf of gas since November 1999, last reporting volume in April 2026.

Operator of record

XTO Energy Inc.

Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitFina Oil & Chemical CompanySep 3, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,400
total depth, ft
1
permits on file
Sep 3, 1999
last permit issued
Nov 12, 1999
completed
12.7K
cumulative oil, bbl
1.26M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 12, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Floyd Gas Unit G-6-176106Bethany, East (Cotton Valley)XTO Energy Inc.112.7K1.26MNov 1999 – Apr 2026

Gas, mcf lease total

Last 12 months 14,630 · prior 12 11,715(+25%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyNov 1999 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
  3. 3Total E&P USA, Inc.Sep 2003 → Feb 2006
  4. 4XTO Energy Inc.Mar 2006 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
486321-99DrillFina Oil & Chemical CompanyAug 2, 1999Sep 3, 1999Oct 8, 199910,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 12, 1999Floyd Gas Unit G-6-176106Bethany East (Cotton Valley)XTO Energy Inc.Producing9,400

Formation tops

As filed on W-2/G-1. Subsea from 273 ft elevation.Download CSV →

FormationMD ftSubsea
PettitPETTET5,370-5,097
Travis Peak5,702-5,429
Cotton Valley7,744-7,471

Perforations

Perforated and open-hole intervals.

FromToType
8,0529,154Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,51511780 S
4.59,4007.8751,175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 10, 2000Jan 3, 2000Yes
00Mar 23, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534198, documented in the API reference.