TEXAS · WELLS · PANOLA COUNTY · CGU 26 LEASE · API 42-365-34229 · DISTRICT 06

Cgu 26 #11

Plugged

Panola County · Carthage (Cotton Valley) field  · Vertical

Cgu 26 #11 (API 42-365-34229) is a plugged well in Panola County, plugged September 12, 2025, last operated by Tgnr East Texas LLC.

The RRC has issued one drilling permit, issued November 16, 1999, permitted to 9,900 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Massive Anhydrite (marker), James Lime, Travis Peak.

Its lease has reported 1.41M mcf of gas since June 2000, last reporting volume in August 2025.

Operator of record

TGNR East Texas LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Aug 2025
Latest permitUnion Pacific Resources CompanyNov 16, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
1
permits on file
Nov 16, 1999
last permit issued
Jun 15, 2000
completed
0
cumulative oil, bbl
1.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2000 THROUGH Aug 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 15, 2000
Shut in
—
Plugged
Sep 12, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cgu 26 G-6-178427Carthage (Cotton Valley)TGNR East Texas LLC101.41MJun 2000 – Aug 2025

Gas, mcf lease total

Last 12 months 73 · prior 12 1,079(-93%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJun 2000 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  5. 5Cci East Texas Upstream LLCDec 2016 → Jan 2021
  6. 6TGNR East Texas LLCFeb 2021 → Aug 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
488306-99DrillUnion Pacific Resources CompanyOct 7, 1999Nov 16, 1999May 11, 20009,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 15, 2000Cgu 26 G-6-178427Carthage (Cotton Valley)TGNR East Texas LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 314 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE5,040-4,726
James LimeJAMES5,760-5,446
Travis Peak6,380-6,066

Perforations

Perforated and open-hole intervals.

FromToType
8,5248,952Perforated
9,0609,200Perforated
9,2869,462Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,03012.25380 S
4.59,9007.8751,589 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 16, 2000Aug 14, 2000Yes
00Sep 11, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534229, documented in the API reference.