WELL · 42-365-34236 · DISTRICT 6
Werner-Caraway #3
Panola County · Carthage (Page) field · Vertical
Werner-Caraway #3 (API 42-365-34236) is a well in Panola County operated by O Benco Inc., completed December 9, 1999.
The RRC has issued 2 drilling permits (amended once) between 1999 and 2011, permitted to 6,300 ft.
Completion filings report 5 formation tops, including Fredericksburg, Fredricksburg, Paluxy, Rodessa.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Shreveport, LA
- P-5 status
- Inactive (I)
- P-5 last filed
- May 9, 2019
- Permits on file
- 374
- Phone
- (318) 865-8568
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | O Benco Inc. |
| Production reports | Proline Energy Resources Incthrough Apr 2026 |
| Latest permit | O'Benco, Inc.Oct 10, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,300
- total depth, ft
- 3
- permits on file
- Oct 10, 2011
- last permit issued
- Dec 9, 1999
- completed
- 0
- cumulative oil, bbl
- 577K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 9, 1999
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Werner-Caraway G-6-266002 | Carthage (Paluxy) | Proline Energy Resources Inc | 1 | 0 | 370K | Jan 2012 – Jul 2026 |
| Werner-Caraway G-6-176203 | Carthage (Page) | O'Benco, Inc. | 1 | 0 | 207K | Dec 1999 – May 2021 |
Gas, mcf lease total
Last 12 months 5,105 · prior 12 6,040(-15%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1O'Benco, Inc.Dec 1999 → Aug 2016
- 2Proline Energy Resources IncSep 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 725431-99 | Recompletion | O'Benco, Inc. | Sep 30, 2011 | Oct 10, 2011 | Jan 4, 2012 | 6,300 |
| 488719-98 | Drill | O'Benco, Inc. | Feb 14, 2000 | Nov 5, 1999 | — | 6,300 |
| 488719-99 | Drill | O'Benco, Inc. | Oct 21, 1999 | Nov 5, 1999 | Nov 16, 1999 | 6,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-176203 | — | — | — | — |
| — | — G-6-266002 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 187 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,964 | 2,970 | Perforated |
| 6,132 | 6,142 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 707 | 11 | 228 S |
| 4.5 | 6,310 | 7.875 | 1,130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 31, 2013 | Apr 20, 2012 | — |
| 00 | Apr 11, 2000 | Jan 18, 2000 | Yes |
| 00 | Mar 28, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34236 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34236 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36534236, documented in the API reference.