TEXAS · WELLS · PANOLA COUNTY · CGU 17 LEASE · API 42-365-34249 · DISTRICT 06

Cgu 17 #13

Plugged

Panola County · Carthage (Cotton Valley) field  · Vertical

Cgu 17 #13 (API 42-365-34249) is a plugged well in Panola County, plugged February 25, 2026, last operated by Tgnr East Texas LLC.

The RRC has issued one drilling permit, issued November 24, 1999, permitted to 10,000 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Paluxy, James Lime, Pettit, Travis Peak.

Its lease has reported 1.58M mcf of gas since May 2000, with no volume in the three years through April 2026.

Operator of record

TGNR East Texas LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Mar 2015
Latest permitUnion Pacific Resources CompanyNov 24, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
1
permits on file
Nov 24, 1999
last permit issued
May 8, 2000
completed
0
cumulative oil, bbl
1.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2000 THROUGH Mar 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 8, 2000
Shut in
—
Plugged
Feb 25, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cgu 17 G-6-178269Carthage (Cotton Valley)TGNR East Texas LLC101.58MMay 2000 – Mar 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyMay 2000 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Oct 2012
  4. 4Anadarko E&P Onshore LLCFeb 2013 → Mar 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
488882-99DrillUnion Pacific Resources CompanyOct 27, 1999Nov 24, 1999Mar 20, 200010,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 8, 2000Cgu 17 G-6-178269Carthage (Cotton Valley)TGNR East Texas LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 322 ft elevation.Download CSV →

FormationMD ftSubsea
Paluxy3,210-2,888
James LimeJAMES5,655-5,333
Pettit5,895-5,573
Travis Peak6,250-5,928
Cotton Valley8,265-7,943
Bossier9,515-9,193

Perforations

Perforated and open-hole intervals.

FromToType
8,5348,754Perforated
8,9269,336Perforated
9,5329,542Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,03012.25380 S
4.59,7077.8751,466 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 4, 2000Jun 28, 2000Yes
00Sep 1, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534249, documented in the API reference.