WELL · 42-365-34325 · DISTRICT 6

Floyd Gas Unit #12

N

Panola County · Bethany (Transition) field  · Vertical

Floyd Gas Unit #12 (API 42-365-34325) is a well in Panola County operated by Xto Energy Inc., completed February 3, 2008.

The RRC has issued 2 drilling permits between 2000 and 2007, permitted to 8,000 ft.

Completion filings report 3 formation tops, including BMA, James Lime, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Sep 19, 2007
8,000
total depth, ft
2
permits on file
Sep 19, 2007
last permit issued
Feb 3, 2008
completed
0
cumulative oil, bbl
2.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 3, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Floyd Gas Unit G-6-179089Bethany (Travis Peak Cons.)XTO Energy Inc.102.36MMar 2000 – Jul 2026
Floyd Gas Unit G-6-234355Bethany (Transition)XTO Energy Inc.100Feb 2008 – Feb 2008

Gas, mcf lease total

Last 12 months 8,564 · prior 12 10,053(-15%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyApr 2000 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
  3. 3Total E&P USA, Inc.Sep 2003 → Apr 2005
  4. 4XTO Energy Inc.Jan 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
646112-99RecompletionXTO Energy Inc.Sep 14, 2007Sep 19, 2007Dec 27, 20078,000
491447-99DrillFina Oil & Chemical CompanyJan 26, 2000Jan 26, 2000Feb 12, 20008,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-179089————
—— G-6-234355————

Formation tops

As filed on W-2/G-1. Subsea from 322 ft elevation.Download CSV →

FormationMD ftSubsea
BMA4,675-4,353
James LimeJAMES5,162-4,840
Travis Peak5,810-5,488

Perforations

Perforated and open-hole intervals.

FromToType
5,8146,066Perforated
5,8149,225Perforated
6,1526,163Perforated
6,1529,225Perforated
6,2206,225Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,50511—
4.57,6507.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 12, 2008Aug 11, 2008—
00Apr 22, 2008Feb 15, 2008—
00Apr 15, 2008——
00Nov 17, 2000Sep 5, 2000Yes
00Oct 26, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534325, documented in the API reference.