WELL · 42-365-34325 · DISTRICT 6
Floyd Gas Unit #12
Panola County · Bethany (Transition) field · Vertical
Floyd Gas Unit #12 (API 42-365-34325) is a well in Panola County operated by Xto Energy Inc., completed February 3, 2008.
The RRC has issued 2 drilling permits between 2000 and 2007, permitted to 8,000 ft.
Completion filings report 3 formation tops, including BMA, James Lime, Travis Peak.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | XTO Energy Inc.Sep 19, 2007 |
- 8,000
- total depth, ft
- 2
- permits on file
- Sep 19, 2007
- last permit issued
- Feb 3, 2008
- completed
- 0
- cumulative oil, bbl
- 2.36M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 3, 2008
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Floyd Gas Unit G-6-179089 | Bethany (Travis Peak Cons.) | XTO Energy Inc. | 1 | 0 | 2.36M | Mar 2000 – Jul 2026 |
| Floyd Gas Unit G-6-234355 | Bethany (Transition) | XTO Energy Inc. | 1 | 0 | 0 | Feb 2008 – Feb 2008 |
Gas, mcf lease total
Last 12 months 8,564 · prior 12 10,053(-15%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fina Oil & Chemical CompanyApr 2000 → Dec 2000
- 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
- 3Total E&P USA, Inc.Sep 2003 → Apr 2005
- 4XTO Energy Inc.Jan 2008 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 646112-99 | Recompletion | XTO Energy Inc. | Sep 14, 2007 | Sep 19, 2007 | Dec 27, 2007 | 8,000 |
| 491447-99 | Drill | Fina Oil & Chemical Company | Jan 26, 2000 | Jan 26, 2000 | Feb 12, 2000 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-179089 | — | — | — | — |
| — | — G-6-234355 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 322 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 4,675 | -4,353 |
| James LimeJAMES | 5,162 | -4,840 |
| Travis Peak | 5,810 | -5,488 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,814 | 6,066 | Perforated |
| 5,814 | 9,225 | Perforated |
| 6,152 | 6,163 | Perforated |
| 6,152 | 9,225 | Perforated |
| 6,220 | 6,225 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,505 | 11 | — |
| 4.5 | 7,650 | 7.875 | 750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 12, 2008 | Aug 11, 2008 | — |
| 00 | Apr 22, 2008 | Feb 15, 2008 | — |
| 00 | Apr 15, 2008 | — | — |
| 00 | Nov 17, 2000 | Sep 5, 2000 | Yes |
| 00 | Oct 26, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34325 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34325 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36534325, documented in the API reference.