TEXAS · WELLS · PANOLA COUNTY · API 42-365-34363 · DISTRICT 06

Adams T. C. NCT-1 #47

Shut in

Panola County · Bethany (Travis Peak Cons.) field · Temp Abandoned  · Vertical

Adams T. C. Nct-1 #47 (API 42-365-34363) is a well in Panola County operated by Tgnr Panola LLC, completed July 2, 2001 and listed as temp abandoned on the RRC schedule, shut in December 1, 2015.

The RRC has issued 3 drilling permits between 2000 and 2003, permitted to 9,400 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Base M.A., Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Panola LLC

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsChevron U. S. A. Inc.through Nov 2015
Latest permitChevron U. S. A. Inc.May 14, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,400
total depth, ft
3
permits on file
May 14, 2003
last permit issued
Jul 2, 2001
completed
0
cumulative oil, bbl
660K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 2, 2001
Shut in
Dec 1, 2015
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Adams, T. C. et UX NCT-1 G-6-178710Bethany, East (Cotton Valley)TGNR Panola LLC10301KJul 2000 – Jul 2026
Adams, T. C. NCT-1 G-6-183413Bethany (Travis Peak Cons.)TGNR Panola LLC10359KJul 2001 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jul 2000 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Nov 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
531824-99RecompletionChevron U. S. A. Inc.May 12, 2003May 14, 2003—8,050
510890-99RecompletionTexaco E & P Inc.Jun 29, 2001Jun 29, 2001Jun 29, 20019,400
493441-99DrillTexaco E & P Inc.Mar 24, 2000Apr 25, 2000Jun 7, 200010,250

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 2, 2001Adams T. C. NCT-1 G-6-183413Bethany (Travis Peak Cons.)TGNR Panola LLCTemp Abandoned · shut in Mar 1, 20069,400
Sep 15, 2000Adams T. C. et UX NCT-1 G-6-178710Bethany East (Cotton Valley)TGNR Panola LLCTemp Abandoned · shut in Dec 1, 20159,400

Formation tops

As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →

FormationMD ftSubsea
Base M.A.4,639-4,365
Travis Peak5,791-5,517
Cotton Valley8,102-7,828

Perforations

Perforated and open-hole intervals.

FromToType
6,3106,315Perforated
8,2658,268Perforated
8,2828,288Perforated
8,3168,320Perforated
8,4878,495Perforated
8,5548,562Perforated
8,6278,631Perforated
8,7108,714Perforated
8,8988,902Perforated
8,9348,938Perforated
9,2649,268Perforated
9,2969,300Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
9.6252,39912.251,100 S
2.8759,385—590 S
2.8759,3868.75990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 30, 2001Jul 16, 2001Yes
00Aug 2, 2001——
00Dec 13, 2000Sep 19, 2000Yes
00Dec 5, 2000Aug 2, 2000Yes
00Oct 4, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534363, documented in the API reference.