TEXAS · WELLS · PANOLA COUNTY · GUILL, J.C. LEASE · API 42-365-34371 · DISTRICT 06

Guill J.C. #3

Shut in

Panola County · Carthage North (Cotton Valley) field · Temp Abandoned  · Vertical

Guill J.C. #3 (API 42-365-34371) is a well in Panola County operated by Tgnr East Texas II LLC, completed June 12, 2000 and listed as temp abandoned on the RRC schedule, shut in September 1, 2019.

The RRC has issued one drilling permit, issued April 6, 2000, permitted to 10,007 ft.

It was permitted by Williams, Clayton Energy, Inc. and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Travis Peak, Cotton Valley, Taylor.

Its lease has reported 3.04K barrels of oil and 1.25M mcf of gas since June 2000, with no volume in the three years through April 2026.

Operator of record

TGNR East Texas II LLC

Permitted by Williams, Clayton Energy, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 18, 2026
Permits on file
162
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas II LLC
Production reportsTGNR East Texas II LLCthrough Sep 2020
Latest permitWilliams, Clayton Energy, Inc.Apr 6, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,007
total depth, ft
1
permits on file
Apr 6, 2000
last permit issued
Jun 12, 2000
completed
3.04K
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2000 THROUGH Sep 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 12, 2000
Shut in
Sep 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guill, J.C. G-6-177749Carthage, North (Cotton Valley)TGNR East Texas II LLC13.04K1.25MJun 2000 – Sep 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Williams, Clayton Energy, Inc.Jun 2000 → Sep 2001
  2. 2Samson Lone Star LPOct 2001 → Jun 2007
  3. 3Samson Lone Star, LLCJul 2007 → Sep 2017
  4. 4Rockcliff Energy Operating LLCOct 2017 → Sep 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
493777-99DrillWilliams, Clayton Energy, Inc.Apr 5, 2000Apr 6, 2000May 5, 200010,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 12, 2000Guill J.C. G-6-177749Carthage North (Cotton Valley)TGNR East Texas II LLCTemp Abandoned · shut in Sep 1, 201910,007

Formation tops

As filed on W-2/G-1. Subsea from 430 ft elevation.Download CSV →

FormationMD ftSubsea
Travis Peak6,155-5,725
Cotton Valley8,660-8,230
Taylor9,745-9,315

Perforations

Perforated and open-hole intervals.

FromToType
8,6608,670Perforated
9,7699,776Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,02011541 S
4.59,9987.8751,840 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 6, 2000Jun 29, 2000Yes
00Jul 31, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534371, documented in the API reference.