WELL · 42-365-34386 · DISTRICT 6
Brantley Bertha et AL #2
Panola County · Joaquin (Travis Peak) field · Vertical
Brantley Bertha ET AL #2 (API 42-365-34386) is a plugged well in Panola County, plugged December 23, 2016, last operated by Maximus Operating Ltd..
The RRC has issued one drilling permit, issued May 23, 2000, permitted to 7,800 ft.
It was permitted by Strat Land Exploration Company and has since transferred to Maximus Operating Ltd. on the wellbore schedule.
Completion filings report 5 formation tops, including Glen Rose, Massive Anhydrite (marker), James Lime, Pettit.
Operator of record
Permitted by Strat Land Exploration Company; the EWA schedule now lists a different operator.
- Based in
- Kilgore, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 1, 2025
- Permits on file
- 107
- Phone
- (903) 984-3443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maximus Operating Ltd. |
| Production reports | Maximus Operating, Ltd.through Jul 2011 |
| Latest permit | Strat Land Exploration CompanyMay 23, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,800
- total depth, ft
- 1
- permits on file
- May 23, 2000
- last permit issued
- Apr 10, 2001
- completed
- 0
- cumulative oil, bbl
- 219K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2001 THROUGH Dec 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 10, 2001
- Shut in
- —
- Plugged
- Dec 23, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brantley, Bertha et AL G-6-184262 | Joaquin (Travis Peak) | Maximus Operating, Ltd. | 1 | 0 | 219K | Apr 2001 – Dec 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Strat Land Exploration CompanyApr 2001 → Mar 2008
- 2Maximus Operating, Ltd.Apr 2008 → Jul 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 495154-99 | Drill | Strat Land Exploration Company | May 17, 2000 | May 23, 2000 | Nov 6, 2000 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-184262 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 177 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen RoseTOP GLEN ROSE | 3,100 | -2,923 |
| Massive Anhydrite (marker)TOP MASSIVE ANHYDRITE | 4,405 | -4,228 |
| Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE | 4,820 | -4,643 |
| James Lime | 5,385 | -5,208 |
| PettitTOP PETTET | 5,708 | -5,531 |
| Travis PeakTOP TRAVIS PEAK | 6,400 | -6,223 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,536 | 7,092 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 581 | 17.5 | 479 S |
| 8.625 | 1,594 | 11 | 550 S |
| 4.5 | 7,700 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 1, 2001 | Aug 6, 2001 | Yes |
| 00 | Sep 13, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34386 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34386 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36534386, documented in the API reference.