WELL · 42-365-34388 · DISTRICT 6
Beall-Norman Unit #17F
Panola County · Carthage (Travis Peak 6400) field · Shut IN · Vertical
Beall-Norman Unit #17F (API 42-365-34388) is a well in Panola County operated by Tgnr Panola LLC, completed July 5, 2001 and listed as shut in on the RRC schedule.
The RRC has issued 2 drilling permits between 2000 and 2001, permitted to 11,500 ft.
It was permitted by Texaco E & P Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Base Of M.A., Travis Peak, Cotton Valley.
Its 2 leases have reported 22.5K barrels of oil and 1.41M mcf of gas since October 2000, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 27, 2026
- Permits on file
- 69
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR Panola LLC |
| Production reports | TGNR Panola LLCthrough Apr 2026 |
| Latest permit | Texaco E & P Inc.Jun 21, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 2
- permits on file
- Jun 21, 2001
- last permit issued
- Jul 5, 2001
- completed
- 22.5K
- cumulative oil, bbl
- 1.41M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 5, 2001
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beall-Norman G-6-179932 | Carthage (Cotton Valley) | TGNR Panola LLC | 1 | 0 | 972K | Oct 2000 – Jul 2026 |
| Beall-Norman Unit O-6-14099 | Carthage (Travis Peak 6400) | TGNR Panola LLC | 4 | 22.5K | 440K | Jul 2001 – Jul 2026 |
Gas, mcf lease total
Last 12 months 21,028 · prior 12 26,532(-21%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Oct 2000 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Mar 2025
- 3TGNR Panola LLCApr 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 510542-99 | Recompletion | Texaco E & P Inc. | Jun 21, 2001 | Jun 21, 2001 | Jun 27, 2001 | 9,865 |
| 495203-99 | Drill | Texaco E & P Inc. | May 18, 2000 | Jun 16, 2000 | Aug 21, 2000 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-179932 | — | — | — | — |
| — | — O-6-14099 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 300 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base of M.A. | 5,300 | -5,000 |
| Travis Peak | 6,400 | -6,100 |
| Cotton Valley | 8,326 | -8,026 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,406 | 6,593 | Perforated |
| 8,615 | 8,617 | Perforated |
| 8,632 | 8,634 | Perforated |
| 8,655 | 8,657 | Perforated |
| 8,722 | 8,726 | Perforated |
| 8,760 | 8,763 | Perforated |
| 8,782 | 8,786 | Perforated |
| 8,828 | 8,831 | Perforated |
| 8,878 | 8,881 | Perforated |
| 8,950 | 8,956 | Perforated |
| 8,956 | 8,950 | Perforated |
| 9,012 | 9,016 | Perforated |
| 9,238 | 9,241 | Perforated |
| 9,318 | 9,321 | Perforated |
| 9,361 | 9,365 | Perforated |
| 9,692 | 9,700 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | — | — |
| 6 | 60 | — | — |
| 9.875 | 1,027 | 12.25 | 480 S |
| 2.875 | 9,835 | — | 616 S |
| 2.875 | 9,844 | 8.75 | 2,321 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 23, 2001 | Jul 16, 2001 | Yes |
| 00 | Jul 27, 2001 | — | — |
| 00 | Mar 7, 2001 | Dec 27, 2000 | Yes |
| 00 | Jan 26, 2001 | Nov 8, 2000 | Yes |
| 00 | Dec 13, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34388 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34388 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36534388, documented in the API reference.