TEXAS · WELLS · PANOLA COUNTY · API 42-365-34522 · DISTRICT 06
House W. F. Unit #14
Panola County · Beckville (Pettit 6800) field · Vertical
House W. F. Unit #14 (API 42-365-34522) is a plugged well in Panola County, plugged February 5, 2013, last operated by Chevron U. S. A. Inc..
The RRC has issued 2 drilling permits between 2000 and 2011, permitted to 10,500 ft.
Completion filings report 3 formation tops, including Base Of M.A., Travis Peak, Cotton Valley.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 30, 2026
- Permits on file
- 9,293
- Phone
- (866) 212-1212
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chevron U. S. A. Inc. |
| Production reports | Chevron U. S. A. Inc.through Jan 2012 |
| Latest permit | Chevron U. S. A. Inc.Feb 25, 2011 |
- 10,500
- total depth, ft
- 2
- permits on file
- Feb 25, 2011
- last permit issued
- Dec 19, 2011
- completed
- 0
- cumulative oil, bbl
- 728K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2001 THROUGH Jan 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 19, 2011
- Shut in
- —
- Plugged
- Feb 5, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| House, W. F. Unit G-6-266912 | Beckville (Pettit 6800) | Chevron U. S. A. Inc. | 1 | 0 | 34 | Dec 2011 – Feb 2013 |
| House, W. F. Unit G-6-182634 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | 1 | 0 | 728K | Apr 2001 – Dec 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Apr 2001 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Jan 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 710701-99 | Recompletion | Chevron U. S. A. Inc. | Feb 21, 2011 | Feb 25, 2011 | Dec 5, 2011 | 10,500 |
| 500106-99 | Drill | Texaco E & P Inc. | Sep 27, 2000 | Oct 5, 2000 | Mar 11, 2001 | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 19, 2011 | House W. F. Unit G-6-266912 | Beckville (Pettit 6800) | Chevron U. S. A. Inc. | Plugged | — |
| Apr 18, 2001 | House W. F. Unit G-6-182634 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 318 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base of M.A. | 5,270 | -4,952 |
| Travis Peak | 6,380 | -6,062 |
| Cotton Valley | 8,520 | -8,202 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,172 | 6,184 | Perforated |
| 6,230 | 6,244 | Perforated |
| 6,284 | 6,298 | Perforated |
| 8,614 | 8,950 | Perforated |
| 8,990 | 9,264 | Perforated |
| 9,344 | 9,732 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | — | — |
| 8.625 | 1,132 | 11 | 310 S |
| 4.5 | 9,890 | 7.875 | 1,090 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 28, 2013 | Feb 2, 2012 | — |
| 00 | Jul 20, 2001 | May 22, 2001 | Yes |
| 00 | Jun 6, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34522 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34522 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36534522, documented in the API reference.