TEXAS · WELLS · PANOLA COUNTY · CGU 10 LEASE · API 42-365-34583 · DISTRICT 06

Cgu 10 #16

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Directional

Cgu 10 #16 (API 42-365-34583) is a well in Panola County operated by Tgnr East Texas LLC, completed May 16, 2001 and listed as temp abandoned on the RRC schedule, shut in June 1, 2018.

The RRC has issued one drilling permit, issued December 14, 2000, permitted to 9,850 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, BMA, Rodessa, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsCci East Texas Upstream LLCthrough May 2018
Latest permitUnion Pacific Resources CompanyDec 14, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,850
total depth, ft
1
permits on file
Dec 14, 2000
last permit issued
May 16, 2001
completed
0
cumulative oil, bbl
515K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 16, 2001
Shut in
Jun 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cgu 10 G-6-185093Carthage (Cotton Valley)TGNR East Texas LLC10515KMay 2001 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rme Petroleum CompanyMay 2001 → Nov 2002
  2. 2Anadarko E&P Company LPDec 2002 → Dec 2012
  3. 3Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  4. 4Cci East Texas Upstream LLCDec 2016 → May 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
502799-99DrillUnion Pacific Resources CompanyDec 6, 2000Dec 14, 2000Mar 18, 200111,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 16, 2001Cgu 10 G-6-185093Carthage (Cotton Valley)TGNR East Texas LLCTemp Abandoned · shut in Jun 1, 20189,850

Formation tops

As filed on W-2/G-1. Subsea from 295 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk2,395-2,100
BMA4,790-4,495
Rodessa5,125-4,830
Travis Peak6,135-5,840
Cotton Valley8,100-7,805
Bossier9,490-9,195

Perforations

Perforated and open-hole intervals.

FromToType
8,4468,718Perforated
8,9709,320Perforated
9,6169,686Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,95212.251,335 S
4.59,8507.8751,512 S
16———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 8, 2001Sep 20, 2001Yes
00Oct 29, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534583, documented in the API reference.