TEXAS · WELLS · PANOLA COUNTY · API 42-365-34679 · DISTRICT 06
Beall W. F. A #16
Panola County · Carthage (Travis Peak 6400) field · Temp Abandoned · Vertical
Beall W. F. A #16 (API 42-365-34679) is a well in Panola County operated by Tgnr Panola LLC, completed June 30, 2009 and listed as temp abandoned on the RRC schedule, shut in April 1, 2015.
The RRC has issued 2 drilling permits between 2001 and 2009, permitted to 9,958 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.
Its 2 leases have reported 1.95K barrels of oil and 651K mcf of gas since March 2002, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 27, 2026
- Permits on file
- 69
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR Panola LLC |
| Production reports | TGNR Panola LLCthrough Jun 2016 |
| Latest permit | Chevron U. S. A. Inc.May 22, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,958
- total depth, ft
- 2
- permits on file
- May 22, 2009
- last permit issued
- Jun 30, 2009
- completed
- 1.95K
- cumulative oil, bbl
- 651K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2002 THROUGH Jun 2016
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 30, 2009
- Shut in
- Apr 1, 2015
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Beall, W. F. "A" G-6-250355 | Carthage (Travis Peak 6400) | TGNR Panola LLC | 1 | 1.95K | 73.4K | Jun 2009 – Jun 2016 |
| Beall, W.F. G-6-188231 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | 1 | 0 | 577K | Mar 2002 – Jun 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Mar 2002 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Jun 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 680692-99 | Recompletion | Chevron U. S. A. Inc. | Apr 23, 2009 | May 22, 2009 | Jun 17, 2009 | 8,950 |
| 508853-99 | Drill | Texaco E & P Inc. | May 11, 2001 | Jul 13, 2001 | Jan 23, 2002 | 10,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 30, 2009 | Beall W. F. A G-6-250355 | Carthage (Travis Peak 6400) | TGNR Panola LLC | Temp Abandoned · shut in Apr 1, 2015 | 9,958 |
| Mar 28, 2002 | Beall W.F. G-6-188231 | Carthage (Cotton Valley) | Chevron U. S. A. Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 291 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 6,030 | -5,739 |
| Travis Peak | 6,350 | -6,059 |
| Cotton Valley | 8,340 | -8,049 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,416 | 6,538 | Perforated |
| 8,491 | 8,612 | Perforated |
| 8,618 | 9,087 | Perforated |
| 9,149 | 9,526 | Perforated |
| 9,691 | 9,760 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | — | — |
| 8.625 | 1,001 | 12.25 | 625 S |
| 4.5 | 9,958 | 7.625 | 2,115 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 9, 2009 | Sep 3, 2009 | — |
| 00 | Oct 1, 2009 | Jul 29, 2009 | Yes |
| 00 | Aug 24, 2009 | — | — |
| 00 | Jun 4, 2002 | Apr 17, 2002 | Yes |
| 00 | Apr 30, 2002 | — | — |
Well logs
The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.
Open the RRC's log search for this well ↗The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-34679 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-34679 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.