TEXAS · WELLS · PANOLA COUNTY · CGU 19 LEASE · API 42-365-34715 · DISTRICT 06

Cgu 19 #14

Y

Panola County · Carthage (Cotton Valley) field · Producing  · Directional

Cgu 19 #14 (API 42-365-34715) is a well in Panola County operated by Tgnr East Texas LLC, completed March 16, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 7, 2001, permitted to 9,806 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Massive, James Lime, Pettit.

Its lease has reported 2.17M mcf of gas since March 2003, last reporting volume in April 2026.

Operator of record

TGNR East Texas LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Apr 2026
Latest permitAnadarko E&P Company LPAug 7, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,806
total depth, ft
2
permits on file
Aug 7, 2001
last permit issued
Mar 16, 2003
completed
0
cumulative oil, bbl
2.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2003 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 16, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cgu 19 G-6-198586Carthage (Cotton Valley)TGNR East Texas LLC102.17MMar 2003 – Apr 2026

Gas, mcf lease total

Last 12 months 26,117 · prior 12 26,898(-3%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPMar 2003 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  3. 3Cci East Texas Upstream LLCDec 2016 → Jan 2021
  4. 4TGNR East Texas LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
511062-98DrillAnadarko E&P Company LPNov 4, 2003Aug 7, 2001Feb 8, 200311,000
511062-99DrillRme Petroleum CompanyJul 5, 2001Aug 7, 2001—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 16, 2003Cgu 19 G-6-198586Carthage (Cotton Valley)TGNR East Texas LLCProducing9,806

Formation tops

As filed on W-2/G-1. Subsea from 305 ft elevation.Download CSV →

FormationMD ftSubsea
Massive4,980-4,675
James Lime5,690-5,385
PettitUPPER PETTIT LIME5,955-5,650
PettitLOWER PETTIT LIME6,105-5,800

Perforations

Perforated and open-hole intervals.

FromToType
8,6808,832Perforated
9,0269,256Perforated
9,5639,604Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,34512.251,487 S
5.59,8067.8751,490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 18, 2004Jul 11, 2003Yes
00Jan 26, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534715, documented in the API reference.