WELL · 42-365-34864 · DISTRICT 6

Beall-Norman Unit #19

Plugged

Panola County · Carthage (Travis Peak 6400) field  · Vertical

Beall-Norman Unit #19 (API 42-365-34864) is a plugged well in Panola County, plugged April 3, 2023, last operated by Tgnr Panola LLC.

The RRC has issued 2 drilling permits (amended once) between 2002 and 2011, permitted to 11,500 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Tgnr Panola LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.

Its 2 leases have reported 22.5K barrels of oil and 791K mcf of gas since July 2001, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

TGNR Panola LLC

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
69
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Panola LLC
Production reportsChevron U. S. A. Inc.through May 2016
Latest permitChevron U. S. A. Inc.May 19, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
3
permits on file
May 19, 2011
last permit issued
Nov 15, 2011
completed
22.5K
cumulative oil, bbl
791K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 15, 2011
Shut in
—
Plugged
Apr 3, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beall-Norman Unit O-6-14099Carthage (Travis Peak 6400)TGNR Panola LLC422.5K440KJul 2001 – Jul 2026
Beall-Norman G-6-192314Carthage (Cotton Valley)Chevron U. S. A. Inc.10351KDec 2002 – Nov 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jul 2001 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → May 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
716638-98RecompletionChevron U. S. A. Inc.Jun 1, 2011May 19, 2011Jun 26, 201111,500
716638-99RecompletionChevron U. S. A. Inc.May 17, 2011May 19, 2011—11,500
522371-99DrillChevron U. S. A. Inc.Jul 31, 2002Aug 30, 2002Nov 2, 200211,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-192314————
—— O-6-14099————

Formation tops

As filed on W-2/G-1. Subsea from 253 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit5,990-5,737
Travis Peak6,335-6,082
Cotton Valley8,480-8,227

Perforations

Perforated and open-hole intervals.

FromToType
6,4206,424Perforated
8,4849,080Perforated
9,2519,433Perforated
9,5889,668Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
660——
8.6251,00412.25625 S
4.59,7987.8751,950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 1, 2012Dec 15, 2011—
00Feb 20, 2003Jan 10, 2003Yes
00Jan 23, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36534864, documented in the API reference.