TEXAS · WELLS · PANOLA COUNTY · CAMERON UNIT 2 LEASE · API 42-365-35110 · DISTRICT 06

Cameron Unit 2 #9

Shut in

Panola County · Carthage (Cotton Valley) field · Temp Abandoned  · Vertical

Cameron Unit 2 #9 (API 42-365-35110) is a well in Panola County operated by R. Lacy Services Ltd., completed November 7, 2003 and listed as temp abandoned on the RRC schedule, shut in May 1, 2022.

The RRC has issued one drilling permit, issued August 29, 2003, permitted to 9,780 ft.

It was permitted by Lacy Operations, Ltd. and has since transferred to R. Lacy Services Ltd. on the wellbore schedule.

Completion filings report 6 formation tops, including B/Austin Chalk, Glen Rose, BMA, Pettit.

Its lease has reported 3.91K barrels of oil and 760K mcf of gas since November 2003, with no volume in the three years through April 2026.

Operator of record

R. Lacy Services Ltd.

Permitted by Lacy Operations, Ltd.; the EWA schedule now lists a different operator.

Based in
Longview, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
152
Phone
(903) 758-8276

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR. Lacy Services Ltd.
Production reportsR. Lacy Services, Ltd.through Apr 2022
Latest permitLacy Operations, Ltd.Aug 29, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,780
total depth, ft
1
permits on file
Aug 29, 2003
last permit issued
Nov 7, 2003
completed
3.91K
cumulative oil, bbl
760K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2003 THROUGH Apr 2022

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 7, 2003
Shut in
May 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cameron Unit 2 G-6-198841Carthage (Cotton Valley)R. Lacy Services, Ltd.13.91K760KNov 2003 – Apr 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lacy Operations, Ltd.Nov 2003 → Dec 2010
  2. 2R. Lacy Services, Ltd.Jan 2011 → Apr 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535726-99DrillLacy Operations, Ltd.Aug 25, 2003Aug 29, 2003Sep 18, 20039,850

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 7, 2003Cameron Unit 2 G-6-198841Carthage (Cotton Valley)R. Lacy Services Ltd.Temp Abandoned · shut in May 1, 20229,780

Formation tops

As filed on W-2/G-1. Subsea from 218 ft elevation.Download CSV →

FormationMD ftSubsea
B/Austin Chalk2,514-2,296
Glen RoseGLEN ROSE-TEX3,378-3,160
BMA5,064-4,846
Pettit5,852-5,634
Travis Peak6,169-5,951
Cotton Valley8,154-7,936

Perforations

Perforated and open-hole intervals.

FromToType
8,4168,752Perforated
9,0639,191Perforated
9,5209,590Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,03712.25340 S
4.59,7807.8751,260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 23, 2004Dec 10, 2003Yes
00Feb 3, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36535110, documented in the API reference.