TEXAS · WELLS · PANOLA COUNTY · API 42-365-35247 · DISTRICT 06

Rogers Gas Unit #10

Shut in

Panola County · Carthage (Travis Peak) field · Temp Abandoned  · Vertical

Rogers Gas Unit #10 (API 42-365-35247) is a well in Panola County operated by Tgnr East Texas LLC, completed November 24, 2013 and listed as temp abandoned on the RRC schedule, shut in June 1, 2014.

The RRC has issued 2 drilling permits between 2004 and 2013, permitted to 9,462 ft.

It was permitted by Anadarko E&P Onshore LLC and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Austin Chalk, Duck Creek Lime, Kiamichi, Paluxy.

Its 2 leases have reported 522K mcf of gas since November 2004, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

TGNR East Texas LLC

Permitted by Anadarko E&P Onshore LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 4, 2026
Permits on file
41
Phone
(346) 308-2250

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough May 2014
Latest permitAnadarko E&P Onshore LLCJul 19, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,462
total depth, ft
2
permits on file
Jul 19, 2013
last permit issued
Nov 24, 2013
completed
0
cumulative oil, bbl
522K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH May 2014

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 24, 2013
Shut in
Jun 1, 2014
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rogers Gas Unit G-6-272852Carthage (Travis Peak)TGNR East Texas LLC1039.3KNov 2013 – May 2014
Rogers, E.T. Gas Unit G-6-206464Carthage (Cotton Valley)Anadarko E&P Onshore LLC10482KNov 2004 – Oct 2013

No volumes reported on these leases in the last three years.

Wells named Rogers Gas Unit

TGNR East Texas LLC's other wells filed under this lease name in Panola County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPDec 2004 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → May 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
766663-99RecompletionAnadarko E&P Onshore LLCJul 18, 2013Jul 19, 2013Nov 4, 201311,000
541097-99DrillAnadarko E&P Company LPJan 22, 2004Jan 23, 2004Sep 27, 200411,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 24, 2013Rogers Gas Unit G-6-272852Carthage (Travis Peak)TGNR East Texas LLCTemp Abandoned · shut in Jun 1, 20149,462
May 2, 2004Rogers E.T. Gas Unit G-6-206464Carthage (Cotton Valley)Anadarko E&P Onshore LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 207 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk2,264-2,057
Duck Creek Lime2,465-2,258
Kiamichi2,570-2,363
Paluxy2,925-2,718

Perforations

Perforated and open-hole intervals.

FromToType
6,2736,538Perforated
8,6848,942Perforated
9,0029,208Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02412.25380 S
5.59,4628.751,553 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 1, 2014Jun 6, 2014Yes
00May 9, 2005Jan 6, 2005Yes
00Feb 28, 2005——

Well logs

The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.

Open the RRC's log search for this well ↗

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36535247, documented in the API reference.