TEXAS · WELLS · PANOLA COUNTY · PARKER UNIT NO. 3 LEASE · API 42-365-35256 · DISTRICT 06

Parker Unit No. 3 #19

Y

Panola County · Carthage (Cotton Valley) field · Producing  · Vertical

Parker Unit NO. 3 #19 (API 42-365-35256) is a well in Panola County operated by Eqv Operating LLC, completed June 19, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 5, 2004, permitted to 9,801 ft.

It was permitted by Eog Resources, Inc. and has since transferred to Eqv Operating LLC on the wellbore schedule.

Completion filings report 16 formation tops, including Blossum, Paluxy, Glen Rose, Ma.

No lease production has been reported under this well’s leases.

Operator of record

Eqv Operating LLC

Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Sep 24, 2025
Phone
(405) 648-4409

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEqv Operating LLC
Production reportsEqv Operating LLCthrough Apr 2026
Latest permitEOG Resources, Inc.Mar 5, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,801
total depth, ft
1
permits on file
Mar 5, 2004
last permit issued
Jun 19, 2004
completed
0
cumulative oil, bbl
1.23M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 19, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parker Unit No. 3 G-6-205964Carthage (Cotton Valley)Eqv Operating LLC101.23MJun 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 9,482 · prior 12 12,274(-23%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Jun 2004 → Apr 2011
  2. 2Wildhorse Resources, LLCMay 2011 → Jun 2013
  3. 3Memorial Production Oper. LLCJul 2013 → May 2017
  4. 4Amplify Energy Operating LLCJun 2017 → Dec 2025
  5. 5Eqv Operating LLCJan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
541918-99DrillEOG Resources, Inc.Feb 10, 2004Mar 5, 2004May 18, 200410,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 19, 2004Parker Unit No. 3 G-6-205964Carthage (Cotton Valley)Eqv Operating LLCProducing9,801

Formation tops

As filed on W-2/G-1. Subsea from 326 ft elevation.Download CSV →

FormationMD ftSubsea
Blossum2,339-2,013
Paluxy3,462-3,136
Glen Rose3,653-3,327
MA5,066-4,740
Hill5,359-5,033
Gloyd5,407-5,081
James Lime5,773-5,447
U Pettit6,021-5,695
L Pettit6,172-5,846
T Peak6,380-6,054
CV B LM8,339-8,013
CV B LM MRK8,454-8,128
CV D8,677-8,351
CV I9,302-8,976
CV Taylor9,628-9,302
BossierBOSSIER SHALE9,705-9,379

Perforations

Perforated and open-hole intervals.

FromToType
8,4818,827Perforated
8,8589,060Perforated
9,2329,361Perforated
9,3619,704Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62566712.25300 S
4.59,8007.8751,545 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 25, 2005Nov 17, 2004Yes
00Feb 8, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.