TEXAS · WELLS · PANOLA COUNTY · JACKSON-WYATT GAS UNIT LEASE · API 42-365-35616 · DISTRICT 06
Jackson-Wyatt Gas Unit #3
Panola County · Beckville (Cotton Valley) field · Temp Abandoned · Directional
Jackson-Wyatt Gas Unit #3 (API 42-365-35616) is a well in Panola County operated by Tgnr East Texas II LLC, completed April 4, 2005 and listed as temp abandoned on the RRC schedule, shut in January 1, 2018.
The RRC has issued one drilling permit, issued January 11, 2005, permitted to 10,252 ft.
It was permitted by Goodrich Petroleum Company and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.
Completion filings report 6 formation tops, including James Lime, Sligo, Pettit, Travis Peak.
Its lease has reported 4.32K barrels of oil and 812K mcf of gas since April 2005, with no volume in the three years through April 2026.
Operator of record
Permitted by Goodrich Petroleum Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 162
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas II LLC |
| Production reports | TGNR East Texas II LLCthrough Dec 2017 |
| Latest permit | Goodrich Petroleum CompanyJan 11, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,252
- total depth, ft
- 1
- permits on file
- Jan 11, 2005
- last permit issued
- Apr 4, 2005
- completed
- 4.32K
- cumulative oil, bbl
- 812K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Dec 2017
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 4, 2005
- Shut in
- Jan 1, 2018
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jackson-Wyatt Gas Unit G-6-210023 | Beckville (Cotton Valley) | TGNR East Texas II LLC | 1 | 4.32K | 812K | Apr 2005 – Dec 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Goodrich Petroleum CompanyApr 2005 → Jun 2014
- 2Samson Lone Star, LLCJul 2014 → Jul 2017
- 3Rockcliff Energy Operating LLCDec 2017 → Dec 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 556024-99 | Drill | Goodrich Petroleum Company | Jan 11, 2005 | Jan 11, 2005 | Jan 18, 2005 | 10,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 4, 2005 | Jackson-Wyatt Gas Unit G-6-210023 | Beckville (Cotton Valley) | TGNR East Texas II LLC | Temp Abandoned · shut in Jan 1, 2018 | 10,252 |
Formation tops
As filed on W-2/G-1. Subsea from 345 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES | 6,244 | -5,899 |
| Sligo | 6,487 | -6,142 |
| Pettit | 6,666 | -6,321 |
| Travis Peak | 6,825 | -6,480 |
| Cotton ValleyBASE COTTON VALLEY "B" LIME | 8,877 | -8,532 |
| TaylorTAYLOR SD | 9,962 | -9,617 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,330 | 9,560 | Perforated |
| 9,596 | 9,810 | Perforated |
| 9,985 | 10,020 | Perforated |
| 10,354 | 10,546 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,391 | 12.25 | 580 S |
| 7 | 6,691 | 8.75 | 530 S |
| 4.5 | 10,640 | 6.125 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 17, 2005 | Apr 15, 2005 | Yes |
| 00 | Aug 12, 2005 | — | — |
Well logs
2 logs loaded from the RRC's log index, the latest received Sep 30, 2008. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITYSpans James Lime, Sligo, Pettit, Travis Peak, Cotton Valley, Taylor | TIFF | 1,130 to 10,620 | Sep 30, 2008run Jul 9, 2005 | 13.3 |
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Pettit, Travis Peak, Cotton Valley, Taylor | TIFF | 6,684 to 10,658 | Jul 23, 2008run Feb 25, 2005 | 9.08 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-35616 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-35616 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36535616, documented in the API reference.