TEXAS · WELLS · PANOLA COUNTY · API 42-365-35841 · DISTRICT 06

Nellie Owens #13

Y

Panola County · Carthage (Travis Peak) field · Producing  · Vertical

Nellie Owens #13 (API 42-365-35841) is a well in Panola County operated by Xto Energy Inc., completed August 18, 2016 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2005 and 2016, permitted to 9,482 ft.

Completion filings report 6 formation tops, including James Lime, Pettit, Travis Peak, Cotton Valley.

Its 2 leases have reported 12K barrels of oil and 391K mcf of gas since November 2005, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.May 17, 2016
9,482
total depth, ft
2
permits on file
May 17, 2016
last permit issued
Aug 18, 2016
completed
12K
cumulative oil, bbl
391K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 18, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Owens, Nellie G-6-217470Carthage (Cotton Valley)XTO Energy Inc.10213KNov 2005 – Jul 2026
Nellie Owens O-6-15524Carthage (Travis Peak)XTO Energy Inc.112K177KAug 2016 – Jul 2026

Gas, mcf lease total

Last 12 months 8,514 · prior 12 9,798(-13%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 948 · prior 12 1,119(-15%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Nov 2005 → Jul 2006
  2. 2Exxon Mobil CorporationAug 2006 → Dec 2013
  3. 3XTO Energy Inc.Jan 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
815563-99RecompletionXTO Energy Inc.May 11, 2016May 17, 2016Jul 29, 20169,482
604565-99DrillChesapeake Operating, Inc.Aug 8, 2005Aug 8, 2005Sep 19, 200510,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 18, 2016Nellie Owens O-6-15524Carthage (Travis Peak)XTO Energy Inc.Producing9,482
Nov 8, 2005Owens Nellie G-6-217470Carthage (Cotton Valley)XTO Energy Inc.Partial Plug · shut in Jul 1, 20169,482

Formation tops

As filed on W-2/G-1. Subsea from 255 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES5,458-5,203
Pettit5,729-5,474
Travis Peak6,078-5,823
Travis Peak6,102-5,847
Cotton ValleyUPPER COTTON VALLEY8,193-7,938
Upper CV8,193-7,938
Cotton ValleyCOTTON VALLEY TAYLOR9,110-8,855
Bossier9,290-9,035

Perforations

Perforated and open-hole intervals.

FromToType
6,0826,190Perforated
8,5079,215Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.7553514.75425 S
8.6255,25910.625500 S
4.59,4827.8751,215 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 22, 2017Sep 9, 2016—
00Nov 10, 2006Jan 25, 2006—
00Jul 28, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36535841, documented in the API reference.