WELL · 42-365-35965 · DISTRICT 6
Werner-Powell #4
Panola County · Carthage (Cotton Valley) field · Vertical
Werner-Powell #4 (API 42-365-35965) is a plugged well in Panola County, plugged November 13, 2020, last operated by Petroquest Energy L.L.C..
The RRC has issued one drilling permit (amended once), issued November 22, 2005, permitted to 10,200 ft.
It was permitted by Chevron U. S. A. Inc. and has since transferred to Petroquest Energy L.L.C. on the wellbore schedule.
Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.
Operator of record
Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.
- Based in
- Lafayette, LA
- P-5 status
- Delinquent (D)
- P-5 last filed
- Feb 20, 2025
- Permits on file
- 113
- Phone
- (337) 232-7028
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petroquest Energy L.L.C. |
| Production reports | Chevron U. S. A. Inc.through Mar 2016 |
| Latest permit | Chevron U. S. A. Inc.Nov 22, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,200
- total depth, ft
- 2
- permits on file
- Nov 22, 2005
- last permit issued
- Sep 23, 2006
- completed
- 0
- cumulative oil, bbl
- 480K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2006 THROUGH Nov 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 23, 2006
- Shut in
- —
- Plugged
- Nov 13, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Werner-Powell G-6-222957 | Carthage (Cotton Valley) | Petroquest Energy, L.L.C. | 1 | 0 | 480K | Sep 2006 – Nov 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Sep 2006 → Mar 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 609930-98 | Drill | Chevron U. S. A. Inc. | May 1, 2006 | Nov 22, 2005 | Aug 22, 2006 | 10,200 |
| 609930-99 | Drill | Chevron U. S. A. Inc. | Nov 22, 2005 | Nov 22, 2005 | — | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-222957 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 230 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| PettitLOWER PETTET | 6,040 | -5,810 |
| Travis Peak | 6,200 | -5,970 |
| Cotton ValleyCOTTON VALLEY SANDS | 8,530 | -8,300 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,334 | 9,054 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,030 | 12.25 | 380 S |
| 4.5 | 9,916 | 7.875 | 1,490 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 30, 2007 | Nov 22, 2006 | Yes |
| 00 | Dec 8, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-35965 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-35965 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36535965, documented in the API reference.