TEXAS · WELLS · PANOLA COUNTY · API 42-365-36712 · DISTRICT 06
Woolworth J.D. Unit #14
Panola County · Carthage (Travis Peak) field · SWR-10-Well · Vertical
- Fields on the latest permit · any of 2
- Carthage (Cotton Valley) · Carthage (Travis Peak)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Woolworth J.D. Unit #14 (API 42-365-36712) is a well in Panola County operated by Xto Energy Inc., completed August 17, 2008 and listed as swr-10-well on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued July 2, 2007, permitted to 9,753 ft.
Completion filings report 5 formation tops, including Pettit, Travis Peak, Base B Lime, D Sand.
Its 2 leases have reported 20.7K barrels of oil and 1.74M mcf of gas since August 2008, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | XTO Energy Inc.Jul 2, 2007 |
- 9,753
- total depth, ft
- 2
- permits on file
- Jul 2, 2007
- last permit issued
- Aug 17, 2008
- completed
- 20.7K
- cumulative oil, bbl
- 1.74M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2008 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 17, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Woolworth, J.D. Unit G-6-240635 | Carthage (Cotton Valley) | XTO Energy Inc. | 1 | 20.7K | 1.74M | Aug 2008 – Apr 2026 |
| Woolworth, J.D. Unit G-6-240636 | Carthage (Travis Peak) | XTO Energy Inc. | 1 | 0 | 0 | Aug 2008 – — |
Gas, mcf lease total
Last 12 months 37,920 · prior 12 40,285(-6%)
Wells named Woolworth J.D. Unit
XTO Energy Inc.'s other wells filed under this lease name in Panola County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Aug 2008 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 639597-98 | Drill | XTO Energy Inc. | May 5, 2008 | Jul 2, 2007 | May 17, 2008 | 12,000 |
| 639597-99 | Drill | XTO Energy Inc. | May 24, 2007 | Jul 2, 2007 | May 17, 2008 | 10,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 17, 2008 | Woolworth J.D. Unit G-6-240636 | Carthage (Travis Peak) | XTO Energy Inc. | SWR-10-Well · shut in Aug 1, 2008 | 9,753 |
| Aug 17, 2008 | Woolworth J.D. Unit G-6-240635 | Carthage (Cotton Valley) | XTO Energy Inc. | Producing | 9,753 |
Formation tops
As filed on W-2/G-1. Subsea from 285 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 5,762 | -5,477 |
| Travis Peak | 6,243 | -5,958 |
| Base B Lime | 8,329 | -8,044 |
| D Sand | 8,393 | -8,108 |
| CV | 9,302 | -9,017 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,135 | 7,834 | Perforated |
| 8,400 | 9,590 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,100 | 14.5 | 880 S |
| 9.625 | 5,366 | 12.25 | 1,890 S |
| 7 | 9,753 | 8.75 | 810 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 22, 2008 | Oct 7, 2008 | Yes |
| 00 | Oct 17, 2008 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received Jun 14, 2011. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITYSpans Pettit, Travis Peak, Base B Lime, D Sand, Cv | TIFF | 5,362 to 9,748 | Jun 14, 2011run Jun 9, 2008 | 6.53 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-365-36712 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-365-36712 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36536712, documented in the API reference.