TEXAS · WELLS · PANOLA COUNTY · API 42-365-37124 · DISTRICT 06

Smith JJ Oil & Gas Unit #8

Plugged

Panola County · Carthage (Travis Peak) field  · Directional

Smith JJ Oil & Gas Unit #8 (API 42-365-37124) is a plugged well in Panola County, plugged January 20, 2016, last operated by Anadarko E&P Onshore LLC.

The RRC has issued 2 drilling permits between 2008 and 2012, permitted to 12,000 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Cotton Valley, C. Sand, Vaughn, Bolinger.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Aug 2015
Latest permitAnadarko E&P Company LPAug 3, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Aug 3, 2012
last permit issued
Aug 15, 2012
completed
0
cumulative oil, bbl
98.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2009 THROUGH Jan 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 15, 2012
Shut in
—
Plugged
Jan 20, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, JJ Oil & Gas Unit G-6-269882Carthage (Travis Peak)Anadarko E&P Onshore LLC1025.5KAug 2012 – Jan 2016
Smith, J. J. G-6-247522Carthage (Cotton Valley)Anadarko E&P Company LP1073.3KJan 2009 – Aug 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPJan 2009 → May 2012
  2. 2Anadarko E&P Onshore LLCAug 2012 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
745237-99RecompletionAnadarko E&P Company LPJul 24, 2012Aug 3, 2012Aug 9, 201212,000
662587-99DrillAnadarko E&P Company LPMay 21, 2008Jun 11, 2008Sep 4, 200812,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 15, 2012Smith JJ Oil & Gas Unit G-6-269882Carthage (Travis Peak)Anadarko E&P Onshore LLCPlugged—
Jan 28, 2009Smith J. J. G-6-247522Carthage (Cotton Valley)Anadarko E&P Onshore LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 276 ft elevation.Download CSV →

FormationMD ftSubsea
Cotton Valley8,519-8,243
C. Sand8,778-8,502
Vaughn8,955-8,679
Bolinger9,230-8,954
Justiss9,351-9,075
Ardis9,484-9,208

Perforations

Perforated and open-hole intervals.

FromToType
7,1147,118Perforated
7,1667,172Perforated
8,4468,830Perforated
9,1049,410Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.751,06814.75570 S
8.6256,57510.6251,375 S
5.59,8047.875591 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 2013May 15, 2013—
00Jun 18, 2009Apr 23, 2009Yes
00Jun 2, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36537124, documented in the API reference.