TEXAS · WELLS · PARKER COUNTY · API 42-367-30910 · DISTRICT 6E

Knight Gas Unit #1

Plugged

Parker County · Coleen (Marble Falls) field  · Vertical

Knight Gas Unit #1 (API 42-367-30910) is a plugged well in Parker County, plugged April 30, 1998, last operated by Smith Pipe Of Abilene.

The RRC has issued one drilling permit, issued November 22, 1977, permitted to 5,150 ft.

It was permitted by Spindletop Oil&Gas Company and has since transferred to Smith Pipe Of Abilene on the wellbore schedule.

Operator of record

Smith Pipe of Abilene

Permitted by Spindletop Oil&gas Company; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 29, 2014
Phone
(325) 692-3903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Pipe of Abilene
Production reportsnone
Latest permitSpindletop Oil&gas CompanyNov 22, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,150
total depth, ft
1
permits on file
Nov 22, 1977
last permit issued
Jan 5, 1978
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 5, 1978
Shut in
—
Plugged
Apr 30, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Knight Gas Unit G-8-74895Males (4850)Smith Pipe of Abilene100Jan 1993 – —
Knight Gas Unit G-8-75327Coleen (Marble Falls)Smith Pipe of Abilene100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
12560-99DrillSpindletop Oil&gas CompanyNov 22, 1977Nov 22, 1977Nov 25, 19775,150

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 5, 1978Knight Gas Unit G-8-75327Coleen (Marble Falls)Smith Pipe of AbilenePlugged—
Dec 12, 1977Knight Gas Unit G-8-74895Males (4850)Smith Pipe of AbilenePlugged—

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540012.25270 S
4.55,0107.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jan 30, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36730910, documented in the API reference.