TEXAS · WELLS · PARKER COUNTY · AREY UNIT LEASE · API 42-367-31202 · DISTRICT 6E
Arey Unit #1
Parker County · Weatherford (Atoka Up.) field · Temp Abandoned · Vertical
Arey Unit #1 (API 42-367-31202) is a well in Parker County operated by Case Resources LLC, completed July 12, 1978 and listed as temp abandoned on the RRC schedule, shut in August 1, 2019.
The RRC has issued one drilling permit, issued June 9, 1978, permitted to 3,700 ft.
It was permitted by Buchanan, Wayman W. and has since transferred to Case Resources LLC on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Buchanan, Wayman W.; the EWA schedule now lists a different operator.
- Based in
- Graham, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Nov 20, 2023
- Phone
- (940) 549-0131
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Case Resources LLC |
| Production reports | Arrowhead Productions, LPthrough Jul 2019 |
| Latest permit | Buchanan, Wayman W.Jun 9, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- Jun 9, 1978
- last permit issued
- Jul 12, 1978
- completed
- 0
- cumulative oil, bbl
- 141K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 12, 1978
- Shut in
- Aug 1, 2019
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arey Unit G-8-80460 | Weatherford (Atoka Up.) | Case Resources, LLC | 1 | 0 | 141K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Taylor, Ben J. Inc.Jan 1993 → Oct 2003
- 2Encana Oil & Gas(usa) Inc.Nov 2003 → Oct 2007
- 3Arrowhead Productions, LPNov 2007 → Jul 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 26067-99 | Drill | Buchanan, Wayman W. | Jun 9, 1978 | Jun 9, 1978 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 12, 1978 | Arey Unit G-8-80460 | Weatherford (Atoka Up.) | Case Resources LLC | Temp Abandoned · shut in Aug 1, 2019 | 3,700 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,396 | 3,452 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 495 | 12.25 | 360 S |
| 2.375 | 3,360 | — | — |
| 4.5 | 3,700 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 25, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-367-31202 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-367-31202 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/36731202, documented in the API reference.