TEXAS · WELLS · PARKER COUNTY · MERRILL LEASE · API 42-367-33151 · DISTRICT 6E

Merrill #1

Plugged

Parker County · Meeker (Conglomerate 4000) field  · Horizontal

Merrill #1 (API 42-367-33151) is a plugged horizontal well in Parker County, plugged July 18, 1994, last operated by Dallas Production Inc..

The RRC has issued one drilling permit, issued October 15, 1991, permitted to 4,800 ft.

Completion filings report 3 formation tops, including Brannon Bridge Limestone, Caddo, Travis Sand.

Its lease has reported 1.75K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Dallas Production Inc.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 11, 2020
Permits on file
823
Phone
(214) 369-9266

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDallas Production Inc.
Production reportsDallas Production, Inc.through May 1993
Latest permitDallas Production, Inc.Oct 15, 1991
4,800
total depth, ft
1
permits on file
Oct 15, 1991
last permit issued
Apr 14, 1992
completed
0
cumulative oil, bbl
1.75K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1993

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 14, 1992
Shut in
—
Plugged
Jul 18, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Merrill G-8-141953Meeker (Conglomerate 4000)Dallas Production, Inc.101.75KJan 1993 – May 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dallas Production, Inc.Jan 1993 → May 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
392923-99DrillDallas Production, Inc.Oct 15, 1991Oct 15, 1991Oct 18, 19914,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 14, 1992Merrill G-8-141953Meeker (Conglomerate 4000)Dallas Production Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,196 ft elevation.Download CSV →

FormationMD ftSubsea
Brannon Bridge Limestone2,176-980
CaddoCADDO CONGLOMERATE4,066-2,870
Travis Sand4,253-3,057

Perforations

Perforated and open-hole intervals.

FromToType
4,5947,033Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37563917.5625 S
9.6254,59412.25320 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 18, 1992Jun 17, 1992Yes
00Aug 12, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36733151, documented in the API reference.