WELL · 42-367-33629 · DISTRICT 9

Henderson #1

Plugged

Parker County · Newark East (Barnett Shale) field  · Vertical

Henderson #1 (API 42-367-33629) is a plugged well in Parker County, plugged August 27, 2015, last operated by Crown Equipment CO..

The RRC has issued one drilling permit, issued December 3, 2004, permitted to 6,400 ft.

Completion filings report 3 formation tops, including Caddo, Marble Falls, Barnett.

Operator of record

Crown Equipment Co.

Based in
Weatherford, TX
P-5 status
Active (A)
P-5 last filed
Nov 12, 2025
Permits on file
110
Phone
(817) 596-0957

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCrown Equipment Co.
Production reportsCrown Equipment Co.through Nov 2014
Latest permitCrown Equipment Co.Dec 3, 2004
6,400
total depth, ft
1
permits on file
Dec 3, 2004
last permit issued
Apr 8, 2006
completed
0
cumulative oil, bbl
31.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Aug 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 8, 2006
Shut in
—
Plugged
Aug 27, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henderson G-13-210102Newark, East (Barnett Shale)Crown Equipment Co.1031.1KDec 2004 – Aug 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crown Equipment Co.Feb 2006 → Nov 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
554406-99DrillCrown Equipment Co.Dec 3, 2004Dec 3, 2004Dec 9, 20046,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-210102————

Formation tops

As filed on W-2/G-1. Subsea from 1,030 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo2,142-1,112
Marble Falls5,060-4,030
BarnettBARNETT SHALE5,450-4,420

Perforations

Perforated and open-hole intervals.

FromToType
5,4485,585Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62541012.25260 S
5.55,6207.875175 S
5.255,6207.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 20, 2006May 15, 2006—
00Oct 12, 2005Jul 18, 2005Yes
00Aug 17, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36733629, documented in the API reference.