TEXAS · WELLS · PARKER COUNTY · WALSH RANCH WEST LEASE · API 42-367-33666 · DISTRICT 7C

Walsh Ranch West #E 3 H

Y

Parker County · Newark East (Barnett Shale) field · Producing  · Horizontal

Walsh Ranch West #E 3 H (API 42-367-33666) is a horizontal well in Parker County operated by Bkv North Texas LLC, completed February 11, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 21, 2005, permitted to 6,715 ft.

It was permitted by Antero Resources I, LP and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Bend, Marble Falls, Barnett.

Its lease has reported 3.82K barrels of oil and 2.31M mcf of gas since July 2005, last reporting volume in April 2026.

Operator of record

BKV North Texas LLC

Permitted by Antero Resources I, LP; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Apr 2026
Latest permitAntero Resources I, LPMar 21, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,715
total depth, ft
1
permits on file
Mar 21, 2005
last permit issued
Feb 11, 2007
completed
3.82K
cumulative oil, bbl
2.31M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2007 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 11, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walsh Ranch West G-13-225091Newark, East (Barnett Shale)BKV North Texas, LLC13.82K2.31MJul 2005 – Apr 2026

Gas, mcf lease total

Last 12 months 56,958 · prior 12 48,503(+17%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Feb 2007 → May 2022
  2. 2BKV North Texas, LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
558995-99DrillAntero Resources I, LPMar 14, 2005Mar 21, 2005Jul 4, 20056,870

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 11, 2007Walsh Ranch West G-13-225091Newark East (Barnett Shale)BKV North Texas LLCProducing6,715

Formation tops

As filed on W-2/G-1. Subsea from 891 ft elevation.Download CSV →

FormationMD ftSubsea
BendBEND CONGLOMERATE5,798-4,907
BendBEND CONGLOMERATE5,862-4,971
Marble Falls6,453-5,562
Marble Falls6,561-5,670
Barnett6,598-5,707
BarnettUPPER BARNETT6,613-5,722

Perforations

Perforated and open-hole intervals.

FromToType
7,1509,029Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62596512.25370 S
5.59,0987.875870 S
5.59,09887870 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 29, 2008May 29, 2007—
00Apr 14, 2007Apr 19, 2006Yes
00Mar 7, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36733666, documented in the API reference.