TEXAS · WELLS · PARKER COUNTY · ROSE LEASE · API 42-367-34118 · DISTRICT 7C

Rose #3H

Shut in

Parker County · Newark East (Barnett Shale) field · Producing  · Horizontal

Rose #3H (API 42-367-34118) is a horizontal well in Parker County operated by Winchester Oil & Gas LLC, completed January 21, 2007 and listed as producing on the RRC schedule, shut in October 1, 2018.

The RRC has issued one drilling permit, issued August 2, 2006, permitted to 5,531 ft.

It was permitted by Shell Western E&P and has since transferred to Winchester Oil & Gas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Strawn, Caddo, Atoka, Bend.

Its lease has reported 3.01K barrels of oil and 725K mcf of gas since January 2007, with no volume in the three years through April 2026.

Operator of record

Winchester Oil & Gas LLC

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

Based in
Rockdale, TX
P-5 status
Delinquent (D)
P-5 last filed
Mar 20, 2024
Permits on file
21
Phone
(713) 269-4969

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWinchester Oil & Gas LLC
Production reportsWinchester Oil & Gas LLCthrough Sep 2018
Latest permitShell Western E&PAug 2, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,531
total depth, ft
1
permits on file
Aug 2, 2006
last permit issued
Jan 21, 2007
completed
3.01K
cumulative oil, bbl
725K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Sep 2018

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 21, 2007
Shut in
Oct 1, 2018
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rose G-13-245624Newark, East (Barnett Shale)Winchester Oil & Gas LLC13.01K725KJan 2007 – Sep 2018

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&PJan 2007 → Dec 2007
  2. 2Pioneer Natural Res. USA, Inc.Jan 2008 → Dec 2013
  3. 3Enervest Operating, L.L.C.Jan 2014 → Sep 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
623682-99DrillShell Western E&PAug 2, 2006Aug 2, 2006Aug 14, 20066,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 21, 2007Rose G-13-245624Newark East (Barnett Shale)Winchester Oil & Gas LLCProducing · shut in Oct 1, 20185,531

Formation tops

As filed on W-2/G-1. Subsea from 1,169 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn2,332-1,163
Caddo3,701-2,532
Atoka3,915-2,746
BendBEND CONGLOMERATES4,649-3,480
Marble Falls5,089-3,920
Barnett5,721-4,552
Barnett——
Caddo——
Marble Falls——

Perforations

Perforated and open-hole intervals.

FromToType
6,0008,375Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62578412.25160 S
5.58,5218.75520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 30, 2013Jul 22, 2013—
00Apr 17, 2009Mar 28, 2007Yes
00Mar 13, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36734118, documented in the API reference.