TEXAS · WELLS · PARKER COUNTY · FRENCH ROAST LEASE · API 42-367-34153 · DISTRICT 7C

French Roast #2H

Plugged

Parker County · Newark East (Barnett Shale) field  · Horizontal

French Roast #2H (API 42-367-34153) is a plugged horizontal well in Parker County, plugged September 20, 2018, last operated by Xto Energy Inc..

The RRC has issued one drilling permit, issued August 29, 2006, permitted to 6,300 ft.

It was permitted by Arrington,David H. Oil & Gas,Inc and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Base Cretaceous (marker), Marble Falls, Barnett.

Its lease has reported 1.19K barrels of oil and 827K mcf of gas since February 2007, with no volume in the three years through April 2026.

Operator of record

XTO Energy Inc.

Permitted by Arrington,david H. Oil & Gas,inc; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Nov 2014
Latest permitArrington,david H. Oil & Gas,incAug 29, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
1
permits on file
Aug 29, 2006
last permit issued
May 29, 2007
completed
1.19K
cumulative oil, bbl
827K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Nov 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 29, 2007
Shut in
—
Plugged
Sep 20, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
French Roast G-13-230994Newark, East (Barnett Shale)XTO Energy Inc.11.19K827KFeb 2007 – Nov 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arrington,david H. Oil & Gas,incMay 2007 → Aug 2007
  2. 2XTO Energy Inc.Sep 2007 → Nov 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
625163-99DrillArrington,david H. Oil & Gas,incAug 29, 2006Aug 29, 2006Sep 25, 20066,300

Completions

CompletedLeaseFieldOperatorStatusDepth
May 29, 2007French Roast G-13-230994Newark East (Barnett Shale)XTO Energy Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,089 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE CRETACEOUS355734
Marble Falls5,130-4,041
BarnettLOWER BARNETT5,492-4,403

Perforations

Perforated and open-hole intervals.

FromToType
6,1706,732Perforated
6,8407,832Perforated
7,9408,962Perforated
9,0789,480Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62541412.25295 S
5.59,5248.75880 S
5.5—8.75640 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 5, 2007Jun 20, 2007Yes
00Nov 30, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36734153, documented in the API reference.