TEXAS · WELLS · PARKER COUNTY · WALSH RANCH WEST LEASE · API 42-367-35382 · DISTRICT 7C

Walsh Ranch West #H 11H

Y

Parker County · Newark East (Barnett Shale) field · Producing  · Horizontal

Walsh Ranch West #H 11H (API 42-367-35382) is a horizontal well in Parker County operated by Bkv North Texas LLC, completed June 8, 2023 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 11, 2013, permitted to 6,732 ft.

It was permitted by Xto Energy Inc. and has since transferred to Bkv North Texas LLC on the wellbore schedule.

Completion filings report 9 formation tops, including Smithwick, Marble Falls, Barnett, Bend.

No lease production has been reported under this well’s leases.

Operator of record

BKV North Texas LLC

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
24
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV North Texas LLC
Production reportsBKV North Texas, LLCthrough Apr 2026
Latest permitXTO Energy Inc.Jul 11, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,732
total depth, ft
2
permits on file
Jul 11, 2013
last permit issued
Jun 8, 2023
completed
0
cumulative oil, bbl
1.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 8, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walsh Ranch West G-13-276165Newark, East (Barnett Shale)BKV North Texas, LLC101.58MJul 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 59,278 · prior 12 68,351(-13%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Oct 2014 → May 2022
  2. 2BKV North Texas, LLCJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
766144-98DrillXTO Energy Inc.Jun 11, 2014Jul 11, 2013Jun 26, 201412,000
766144-99DrillXTO Energy Inc.Jul 9, 2013Jul 11, 2013—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 8, 2023Walsh Ranch West G-13-276165Newark East (Barnett Shale)BKV North Texas LLCProducing6,732

Formation tops

As filed on W-2/G-1. Subsea from 963 ft elevation.Download CSV →

FormationMD ftSubsea
Smithwick5,692-4,729
Marble Falls6,523-5,560
BarnettBARNETT SHALE6,616-5,653
BarnettUPPER BARNETT6,616-5,653
BendBEND CONGLOMERATE - DISPOSAL——
Caddo——
CaddoCADDO CONGLOMERATE - DISPOSAL——
EllenburgerELLENBURGER - DISPOSAL——
StrawnSTRAWN - DISPOSAL——
Trinity - Disposal——
Whittis Sand - Disposal——

Perforations

Perforated and open-hole intervals.

FromToType
7,3167,582Perforated
7,31611,056Perforated
7,7027,968Perforated
8,0888,354Perforated
8,4748,740Perforated
8,8609,126Perforated
9,2469,512Perforated
9,6329,898Perforated
10,01810,284Perforated
10,40410,670Perforated
10,79011,056Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,03912.25410 S
5.511,1088.751,355 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 24, 2023Jun 14, 2023—
00Apr 6, 2015Feb 4, 2015—
00Mar 30, 2015Oct 3, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/36735382, documented in the API reference.