WELL · 42-371-30741 · DISTRICT 8

Arco #6

N

Pecos County · EL Cinco (Wichita Albany) field  · Vertical

Arco #6 (API 42-371-30741) is a well in Pecos County operated by Mexco Energy Corporation, completed March 8, 1999.

The RRC has issued one drilling permit, issued March 2, 1999, permitted to 4,570 ft.

Completion filings report 6 formation tops, including Yates, Seven Rivers, San Andres, Glorieta.

Its 2 leases have reported 5.51K barrels of oil and 63K mcf of gas since March 1999, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 10.9K barrels injected in the 12 months reported through May 2026.

Operator of record

Mexco Energy Corporation

Midland, TX · P-5 Y, filed May 12, 2020 · 31 permits on file · (432) 638-1851

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMexco Energy Corporation
Production reportsMexco Energy Corporationthrough Aug 2010
Latest permitMexco Energy CorporationMar 2, 1999
4,570
total depth, ft
1
permits on file
Mar 2, 1999
last permit issued
Mar 8, 1999
completed
5.51K
cumulative oil, bbl
63K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 8, 1999
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco O-10-36860EL Cinco (Wichita Albany)Darkens Oil & Gas Inc.15.51K35.4KMar 2002 – Jul 2026
Arco G-10-172205EL Cinco (Wichita Albany)Mexco Energy Corporation1027.6KMar 1999 – Jun 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mexco Energy CorporationMar 1999 → Aug 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
482983-99ReenterMexco Energy CorporationFeb 26, 1999Mar 2, 1999Mar 2, 19994,570

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-172205————
—— O-10-36860————

Formation tops

As filed on W-2/G-1. Subsea from 2,285 ft elevation.Download CSV →

FormationMD ftSubsea
Yates8701,415
Seven Rivers9871,298
San Andres1,798487
Glorieta2,2805
Tubb2,938-653
Wichita-AlbanyWICHITA ALBANY4,288-2,003

Perforations

Perforated and open-hole intervals.

FromToType
4,3784,385Perforated
4,3784,521Perforated
4,3874,390Perforated
4,3934,397Perforated
4,5124,521Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,03011450 S
4.54,6017.875900 S
4.54,6077.875900 S
4.54,6857.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 30, 2013Jul 30, 2013—
00Jul 5, 2002Apr 23, 2002—
00Jun 3, 2002——
00Jun 10, 1999Mar 18, 1999Yes
00Mar 26, 1999——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

10.9K
bbl, last 12 reported months
145K
bbl, all reported
May 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000101959H-1 InjectionActive5002,0004,023–4,521

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 10,947 · prior 12 10,684(+2%)

05001K1.5K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37130741, documented in the API reference.