WELL · 42-371-31775 · DISTRICT 8

Arcor #1

Plugged

Pecos County · Fromme field  · Vertical

Arcor #1 (API 42-371-31775) is a plugged well in Pecos County, plugged January 18, 2007, last operated by Avra Oil Company.

The RRC has issued one drilling permit, issued September 28, 2001, permitted to 1,690 ft.

It was permitted by Earnest Producing Corporation and has since transferred to Avra Oil Company on the wellbore schedule.

Completion filings report 4 formation tops, including Yates, San Andres, Glorieta, Clear Fork.

Operator of record

Avra Oil Company

Permitted by Earnest Producing Corporation; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Dec 4, 2025 · 71 permits on file · (214) 392-9123

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAvra Oil Company
Production reportsnone
Latest permitEarnest Producing CorporationSep 28, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,690
total depth, ft
1
permits on file
Sep 28, 2001
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 18, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arcor O-10-36741FrommeAvra Oil Company200Sep 2001 – Mar 2008
Arcor G-10-174847Apco (Clear Fork)Earnest Producing Corporation100Nov 1997 – Sep 2001

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
513944-99RecompletionEarnest Producing CorporationSep 26, 2001Sep 28, 2001Oct 1, 19801,690

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-174847————
—— O-10-36741————
—— O-10-36741————

Formation tops

As filed on W-2/G-1. Subsea from 2,454 ft elevation.Download CSV →

FormationMD ftSubsea
Yates9201,534
San Andres1,950504
Glorieta2,560-106
GlorietaGLORIETTA2,560-106
Clear ForkCLEARFORK2,730-276
Clear ForkUPPER CLEARFORK2,730-276
Clear ForkLOWER CLEARFORK3,100-646

Perforations

Perforated and open-hole intervals.

FromToType
1,4501,477Perforated
3,1043,133Perforated
3,1773,213Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62565311350 S
8.62578211350 S
2.3753,220——
5.53,4007.875695 S
5.53,4207.875695 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 4, 2006Jul 26, 2002—
00Aug 15, 2002Jul 26, 2002—
00Jan 16, 2002Sep 25, 2001Yes
00Nov 20, 2001——
00Mar 3, 2000Jan 18, 2000Yes
00Dec 28, 1999Feb 23, 1977—
00Nov 30, 1999——
00Jan 12, 1984Feb 23, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
7.87K
bbl, all reported
May 2007
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089738H-1 InjectionPlugged Feb 8, 20074007001,350–1,480

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120062007

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37131775, documented in the API reference.