TEXAS · WELLS · PECOS COUNTY · MENDEL ESTATE LEASE · API 42-371-32610 · DISTRICT 7B
Mendel Estate #2
Pecos County · Gomez (Wolfcamp Upper) field · Temp Abandoned · Vertical
Mendel Estate #2 (API 42-371-32610) is a well in Pecos County operated by Mineral Technologies Inc., completed July 3, 1979 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.
The RRC has issued one drilling permit, issued September 6, 1978, permitted to 11,227 ft.
It was permitted by Tenneco Oil CO. and has since transferred to Mineral Technologies Inc. on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Tenneco Oil Co.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Oct 14, 2024
- Permits on file
- 12
- Phone
- (432) 685-3520
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Tenneco Oil Co.Sep 6, 1978 |
- 11,227
- total depth, ft
- 1
- permits on file
- Sep 6, 1978
- last permit issued
- Jul 3, 1979
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 3, 1979
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mendel Estate G-10-83934 | Gomez (Wolfcamp Upper) | Mineral Technologies, Inc. | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 32030-99 | Drill | Tenneco Oil Co. | Sep 6, 1978 | Sep 6, 1978 | Sep 30, 1978 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 3, 1979 | Mendel Estate G-10-83934 | Gomez (Wolfcamp Upper) | Mineral Technologies Inc. | Temp Abandoned · shut in Jan 1, 1998 | 11,227 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,058 | 11,085 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,995 | 14.75 | 1,960 S |
| 2.875 | 9,993 | — | — |
| 7.625 | 10,300 | 9.5 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 29, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-32610 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-32610 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000060384 | W-14 Disposal | Not activated | 480 | 1,100 | 5,260–6,200 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37132610, documented in the API reference.