TEXAS · WELLS · PECOS COUNTY · NEAL, JAMES O. LEASE · API 42-371-32620 · DISTRICT 7B

Neal James O. #6

Plugged

Pecos County · Coyanosa N. (Delaware) field  · Vertical

Neal James O. #6 (API 42-371-32620) is a plugged well in Pecos County, plugged August 28, 2026, last operated by P.O.&G. Operating LLC.

The RRC has issued one drilling permit, issued September 27, 1978, permitted to 6,000 ft.

It was permitted by Mobil Oil Corporation and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.

Its lease has reported 78.1K barrels of oil and 200K mcf of gas since January 1993, last reporting volume in November 2023. The lease carries 9 wells, so these are lease totals, not this well alone.

Operator of record

P.o.&g. Operating LLC

Permitted by Mobil Oil Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Nov 10, 2025
Permits on file
95
Phone
(713) 244-0779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleP.o.&g. Operating LLC
Production reportsP.o.&g. Operating, LLCthrough Nov 2023
Latest permitMobil Oil CorporationSep 27, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
Sep 27, 1978
last permit issued
Jan 4, 1979
completed
78.1K
cumulative oil, bbl
200K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 4, 1979
Shut in
—
Plugged
Aug 28, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neal, James O. O-10-24911Coyanosa, N. (Delaware)P.o.&g. Operating, LLC978.1K200KJan 1993 – Nov 2023

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0100200202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Sep 2001
  2. 2Pecos Production CompanyJan 2003 → Dec 2004
  3. 3Chesapeake Operating, Inc.Jan 2005 → Sep 2012
  4. 4Shell Western E&POct 2012 → Aug 2015
  5. 5Meco IV, LLCOct 2015 → Jun 2021
  6. 6Meco IV Holdco, LLCJul 2021 → Jan 2022
  7. 7P.o.&g. Operating, LLCFeb 2022 → Nov 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
33615-99DrillMobil Oil CorporationSep 27, 1978Sep 27, 1978—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 4, 1979Neal James O. O-10-24911Coyanosa N. (Delaware)P.o.&g. Operating LLCPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
—4,816Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37132620, documented in the API reference.