TEXAS · WELLS · PECOS COUNTY · YATES FIELD UNIT LEASE · API 42-371-32747 · DISTRICT 7B
Yates Field Unit #24C17
Pecos County · Yates field · Shut In · Horizontal · Directional
Yates Field Unit #24C17 (API 42-371-32747) is a horizontal well in Pecos County operated by Kinder Morgan Production CO LLC, completed September 13, 2003 and listed as shut in on the RRC schedule, shut in August 1, 2019.
The RRC has issued 3 drilling permits (amended once) between 1979 and 2003, permitted to 1,840 ft.
Completion filings report 7 formation tops, including Base Cretaceous (marker), Smith Sand, Yates, Seven Rivers.
Its lease has reported 322M barrels of oil and 1.03B mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 1,725 wells, so these are lease totals, not this well alone.
Operator of record
Kinder Morgan Production Co LLC
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 24, 2026
- Permits on file
- 2,631
- Phone
- (688) 688-2310
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kinder Morgan Production Co LLC |
| Production reports | Kinder Morgan Production Co LLCthrough Apr 2026 |
| Latest permit | Kinder Morgan Production Co LLCAug 5, 2003 |
- 1,840
- total depth, ft
- 4
- permits on file
- Aug 5, 2003
- last permit issued
- Sep 13, 2003
- completed
- 322M
- cumulative oil, bbl
- 1.03B
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 13, 2003
- Shut in
- Aug 1, 2019
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 1,725 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yates Field Unit O-10-24061 | Yates | Kinder Morgan Production Co LLC | 1,725 | 322M | 1.03B | Jan 1993 – Apr 2026 |
Oil, barrels lease total
Last 12 months 4,787,640 · prior 12 4,909,756(-2%)
Gas, mcf lease total
Last 12 months 25,164,981 · prior 12 25,634,315(-2%)
Wells named Yates Field Unit
Kinder Morgan Production Co LLC's other wells filed under this lease name in Pecos County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Marathon Oil CompanyJan 1993 → Oct 2003
- 2Kinder Morgan Sacroc LPNov 2003 → Nov 2003
- 3Kinder Morgan Production Co LPDec 2003 → Jul 2007
- 4Kinder Morgan Production Co LLCAug 2007 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 534881-98 | Recompletion | Kinder Morgan Production Co LLC | Aug 31, 2011 | Aug 5, 2003 | Aug 21, 2003 | 1,999 |
| 534881-99 | Recompletion | Marathon Oil Company | Aug 1, 2003 | Aug 5, 2003 | Aug 21, 2003 | 1,999 |
| 484332-99 | Recompletion | Marathon Oil Company | May 6, 1999 | May 6, 1999 | Jun 21, 1999 | 1,999 |
| 47268-99 | Drill | Marathon Oil Company | Apr 26, 1979 | Apr 26, 1979 | May 17, 1979 | 1,741 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 13, 2003 | Yates Field Unit O-10-24061 | Yates | Kinder Morgan Production Co LLC | Shut In · shut in Aug 1, 2019 | 1,840 |
| Sep 13, 2003 | Yates Field Unit O-10-24061 | Yates | Kinder Morgan Production Co LLC | Shut In · shut in Aug 1, 2019 | 1,840 |
Formation tops
As filed on W-2/G-1. Subsea from 2,840 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE CRETACEOUS | 712 | 2,128 |
| Smith Sand | 935 | 1,905 |
| YatesYATES (SMITH SAND) | 935 | 1,905 |
| Seven Rivers | 1,026 | 1,814 |
| Queen | 1,499 | 1,341 |
| Grayburg | 1,536 | 1,304 |
| San Andres | 1,594 | 1,246 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,440 | 1,690 | Perforated |
| 1,726 | 1,736 | Perforated |
| 1,726 | 1,787 | Perforated |
| 1,739 | 1,873 | Perforated |
| 1,746 | 1,756 | Perforated |
| 1,768 | 1,787 | Perforated |
| 1,800 | 1,840 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 990 | 17.5 | 150 S |
| 8.625 | 1,440 | 11 | 700 S |
| 2.375 | 1,688 | — | — |
| 7 | 1,800 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 2011 | Sep 11, 2009 | — |
| 00 | Nov 4, 2003 | Jul 6, 1999 | Yes |
| 00 | Nov 12, 1996 | May 31, 1996 | — |
| 00 | Dec 30, 1993 | Sep 30, 1993 | — |
| 00 | Jan 12, 1984 | Jul 23, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-32747 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-32747 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37132747, documented in the API reference.