WELL · 42-371-33091 · DISTRICT 8

Athey Charles B. -C- #3

Plugged

Pecos County · Coyanosa N. (Delaware) field  · Vertical

Athey Charles B. -C- #3 (API 42-371-33091) is a plugged well in Pecos County, plugged September 21, 2023, last operated by P.O.&G. Operating LLC.

The RRC has issued one drilling permit, issued May 19, 1980, permitted to 5,500 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.

Its lease has reported 93.2K barrels of oil and 263K mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

P.o.&g. Operating LLC

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Nov 10, 2025
Permits on file
95
Phone
(713) 244-0779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleP.o.&g. Operating LLC
Production reportsShell Western E&Pthrough Jan 2013
Latest permitMobil Producing TX. & N.M. Inc.May 19, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
May 19, 1980
last permit issued
Dec 15, 2003
completed
93.2K
cumulative oil, bbl
263K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 15, 2003
Shut in
—
Plugged
Sep 21, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Athey, Charles B. -C- O-10-25296Coyanosa, N. (Delaware)P.o.&g. Operating, LLC693.2K263KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Feb 2001
  2. 2Pecos Production CompanyDec 2002 → Dec 2004
  3. 3Chesapeake Operating, Inc.Jan 2005 → Jul 2011
  4. 4Shell Western E&PDec 2012 → Dec 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
81522-99DrillMobil Producing TX. & N.M. Inc.May 19, 1980May 19, 1980—5,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-25296————

Perforations

Perforated and open-hole intervals.

FromToType
4,7684,840Perforated
4,7684,856Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,86312.25900 S
2.8754,713——
5.55,2007.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 7, 2007Jun 8, 2006—
00Sep 10, 2004Dec 17, 2003—
00Jan 12, 1984Oct 1, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.09M
bbl, all reported
May 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093638H-1 InjectionPlugged Oct 20, 20234,0002,3004,768–4,858

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 71,609(-100%)

05K10K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37133091, documented in the API reference.