TEXAS · WELLS · PECOS COUNTY · ENID LEASE · API 42-371-33392 · DISTRICT 7B

Enid #3

Shut in

Pecos County · Sun Valley (Tubb Lower) field · NO Production  · Vertical

Enid #3 (API 42-371-33392) is a well in Pecos County operated by Last Mile Production LLC, completed August 27, 1981 and listed as no production on the RRC schedule, shut in September 1, 2023.

The RRC has issued one drilling permit, issued April 8, 1981, permitted to 3,351 ft.

It was permitted by Lawrence, C. F. & Assoc. Inc. and has since transferred to Last Mile Production LLC on the wellbore schedule.

Its lease has reported 44.9K barrels of oil and 14.2K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Last Mile Production LLC

Permitted by Lawrence, C. F. & Assoc. Inc.; the EWA schedule now lists a different operator.

Based in
Southlake, TX
P-5 status
Delinquent (D)
P-5 last filed
Feb 18, 2025
Phone
(817) 559-7079

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLast Mile Production LLC
Production reportsLast Mile Production, LLCthrough Jul 2024
Latest permitLawrence, C. F. & Assoc. Inc.Apr 8, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,351
total depth, ft
1
permits on file
Apr 8, 1981
last permit issued
Aug 27, 1981
completed
44.9K
cumulative oil, bbl
14.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 27, 1981
Shut in
Sep 1, 2023
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Enid O-10-26449Sun Valley (Tubb, Lower)Last Mile Production, LLC244.9K14.2KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 609(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lawrence, C. F. & Assoc. Inc.Jan 1993 → Jul 1993
  2. 2Riata Energy, Inc.Aug 1993 → Nov 2006
  3. 3Sandridge Energy, Inc.Dec 2006 → May 2009
  4. 4Sandridge Expl. and Prod., LLCJun 2009 → Jan 2013
  5. 5Sheridan Production Company, LLCFeb 2013 → Feb 2017
  6. 6Iskandia Energy Operating, Inc.Mar 2017 → Jun 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
114347-99DrillLawrence, C. F. & Assoc. Inc.Apr 8, 1981Apr 8, 1981—3,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 27, 1981Enid O-10-26449Sun Valley (Tubb Lower)Last Mile Production LLCNO Production · shut in Sep 1, 20233,351

Perforations

Perforated and open-hole intervals.

FromToType
3,1373,176Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62567810400 S
2.3753,139——
5.53,3517.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Sep 8, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37133392, documented in the API reference.