WELL · 42-371-35100 · DISTRICT 8

Shearer #1

Plugged

Pecos County · Grandma Benoit (Clear Fork Lo.) field  · Vertical

Shearer #1 (API 42-371-35100) is a plugged well in Pecos County, plugged March 21, 2002, last operated by BC Operating Inc..

The RRC has issued one drilling permit, issued August 13, 1984, permitted to 3,600 ft.

It was permitted by O.R.M. Exploration CO. and has since transferred to BC Operating Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Glorieta, Clear Fork, Tubb.

Its lease has reported 24 barrels of oil and 24 mcf of gas since January 1993, last reporting in September 2002.

Operator of record

BC Operating Inc.

Permitted by O.R.M. Exploration Co.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Dec 4, 2025 · 368 permits on file · (432) 296-9379

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBC Operating Inc.
Production reportsDudley Oil Co.through Dec 1994
Latest permitO.R.M. Exploration Co.Aug 13, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
1
permits on file
Aug 13, 1984
last permit issued
Nov 12, 1984
completed
24
cumulative oil, bbl
24
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 12, 1984
Shut in
—
Plugged
Mar 21, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shearer O-10-29563Grandma Benoit (Clear Fork, Lo.)BC Operating, Inc.12424Jan 1993 – Sep 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dudley Oil Co.Jan 1993 → Dec 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
247980-99DrillO.R.M. Exploration Co.Aug 1, 1984Aug 13, 1984—3,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-29563————

Formation tops

As filed on W-2/G-1. Subsea from 2,357 ft elevation.Download CSV →

FormationMD ftSubsea
GlorietaGLORIETTA2,856-499
Clear ForkUPPER CLEARFORK3,005-648
Tubb3,332-975
Clear ForkLOWER CLEARFORK3,407-1,050

Perforations

Perforated and open-hole intervals.

FromToType
3,4043,428Perforated
3,4483,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62552212.25400 S
5.53,5777.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 22, 1985Feb 11, 1985—
00Feb 20, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37135100, documented in the API reference.