TEXAS · WELLS · PECOS COUNTY · API 42-371-35363 · DISTRICT 7B
Downie Ranch #101
Pecos County · Thistle (Overthrust) field · Temp Abandoned · Vertical
Downie Ranch #101 (API 42-371-35363) is a well in Pecos County operated by Longfellow Energy LP, completed August 31, 1993 and listed as temp abandoned on the RRC schedule, shut in March 1, 2009.
The RRC has issued 2 drilling permits between 1985 and 1993, permitted to 7,000 ft.
It was permitted by Shell Western E&P Inc. and has since transferred to Longfellow Energy LP on the wellbore schedule.
Completion filings report 6 formation tops, including Base Cretaceous (marker), Permian (undifferentiated), 1st Caballos, 1st Ordovician.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 26, 2026
- Permits on file
- 37
- Phone
- (972) 590-9900
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shell Western E&P Inc. |
| Production reports | Sandridge Energy, Inc.through Feb 2009 |
| Latest permit | Shell Western E&P Inc.Sep 13, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 2
- permits on file
- Sep 13, 1993
- last permit issued
- Aug 31, 1993
- completed
- 0
- cumulative oil, bbl
- 57.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 31, 1993
- Shut in
- Mar 1, 2009
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Downie Ranch G-10-147186 | Thistle (Overthrust) | Longfellow Energy, LP | 1 | 0 | 57.1K | Aug 1993 – Jul 2026 |
| Downie Ranch O-10-32001 | Wildcat | Shell Western E&P Inc. | 1 | 0 | 0 | Jan 1993 – Nov 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&P Inc.Sep 1993 → Feb 1995
- 2Samis Oil Company, Inc.Mar 1995 → Apr 1996
- 3Huntington Energy, L.L.C.May 1996 → May 2007
- 4Sandridge Energy, Inc.Jun 2007 → Feb 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 415749-99 | Recompletion | Shell Western E&P Inc. | Sep 7, 1993 | Sep 13, 1993 | Aug 30, 1993 | 3,000 |
| 265595-99 | Drill | Shell Western E&P Inc. | Jan 30, 1985 | Jan 31, 1985 | Feb 15, 1985 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 31, 1993 | Downie Ranch G-10-147186 | Thistle (Overthrust) | Longfellow Energy LP | Temp Abandoned · shut in Mar 1, 2009 | 7,000 |
| Apr 2, 1985 | Downie Ranch O-10-32001 | Wildcat | Shell Western E&P Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,249 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE CRETACEOUS | 495 | 2,754 |
| Permian (undifferentiated)BASE PERMIAN | 915 | 2,334 |
| 1ST Caballos | 2,390 | 859 |
| 1ST Ordovician | 2,550 | 699 |
| 2ND Caballos | 4,690 | -1,441 |
| 2ND Ordovician | 5,000 | -1,751 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,488 | 2,551 | Perforated |
| 3,240 | 3,326 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 40 | 26 | — |
| 9.625 | 900 | 12.25 | 400 S |
| 5.5 | 2,720 | 8.75 | 750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 26, 1994 | Nov 1, 1993 | Yes |
| 00 | Dec 1, 1993 | — | — |
| 00 | Nov 21, 1988 | Oct 24, 1988 | Yes |
| 00 | Nov 1, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-35363 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-35363 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37135363, documented in the API reference.