WELL · 42-371-35560 · DISTRICT 8
Zapalac #1
Pecos County · Valentine (Glorieta) field · Vertical
Zapalac #1 (API 42-371-35560) is a plugged well in Pecos County, plugged July 27, 2010, last operated by Oxy USA Inc..
The RRC has issued one drilling permit, issued July 15, 1985, permitted to 4,200 ft.
It was permitted by Banks, R. C. and has since transferred to Oxy USA Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including San Andres, Glorieta, Clear Fork.
Operator of record
Permitted by Banks, R. C.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Dec 4, 2025 · 3,316 permits on file · (713) 215-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | OXY USA Inc. |
| Production reports | Odessa Exploration, Inc.through May 1996 |
| Latest permit | Banks, R. C.Jul 15, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,200
- total depth, ft
- 1
- permits on file
- Jul 15, 1985
- last permit issued
- Sep 10, 1985
- completed
- 0
- cumulative oil, bbl
- 56.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 10, 1985
- Shut in
- —
- Plugged
- Jul 27, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Zapalac G-10-136593 | Valentine (Glorieta) | OXY USA Inc. | 1 | 0 | 56.9K | Jan 1993 – Jul 2010 |
| — O-10-30112 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Banks, R. C.Jan 1993 → Jul 1995
- 2Odessa Exploration, Inc.Aug 1995 → May 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 280157-99 | Drill | Banks, R. C. | Jul 15, 1985 | Jul 15, 1985 | Jul 27, 1985 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-136593 | — | — | — | — |
| — | — O-10-30112 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,378 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 2,415 | -37 |
| San Andres | 2,514 | -136 |
| Glorieta | 3,235 | -857 |
| Clear ForkCLEARFORK | 3,582 | -1,204 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,311 | 3,347 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 115 | 17.5 | 160 S |
| 8.625 | 503 | 12.5 | 325 S |
| 4.5 | 4,195 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 27, 1991 | Dec 6, 1990 | — |
| 00 | Jan 23, 1991 | — | — |
| 00 | Oct 10, 1985 | Sep 24, 1985 | — |
| 00 | Oct 2, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-35560 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-35560 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37135560, documented in the API reference.