WELL · 42-371-35587 · DISTRICT 10

Longfellow State -600- 1 1/2 #1

Plugged

Pecos County  · Vertical

Longfellow State -600- 1 1/2 #1 (API 42-371-35587) is a plugged well in Pecos County, plugged June 30, 2005, last operated by Neg Operating LLC.

The RRC has issued 2 drilling permits between 1985 and 2004, permitted to 7,500 ft.

Operator of record

Neg Operating LLC

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
Dec 10, 2007
Permits on file
238
Phone
(405) 753-5662

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitNeg Operating LLCDec 10, 2004
7,500
total depth, ft
2
permits on file
Dec 10, 2004
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 30, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
554606-99ReenterNeg Operating LLCDec 8, 2004Dec 10, 2004Mar 29, 20057,500
283827-99DrillShell Western E&P Inc.Aug 26, 1985Aug 27, 1985—7,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37135587, documented in the API reference.