TEXAS · WELLS · PECOS COUNTY · WILSON SEC. 44 LEASE · API 42-371-35996 · DISTRICT 7B
Wilson Sec. 44 #1
Pecos County · Anna Maria (Detrital) field · Injection · Vertical
Wilson Sec. 44 #1 (API 42-371-35996) is a well in Pecos County operated by Sbj Oil & Gas LLC, completed February 1, 2010 and listed as injection on the RRC schedule.
The RRC has issued 2 drilling permits between 1987 and 1988, permitted to 7,931 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Sbj Oil & Gas LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Wolfcamp, Ellenburger.
Its lease has reported 244 barrels of oil and 14 mcf of gas since January 1993, last reporting in July 2026.
It holds an active disposal or injection permit, with 1.6K barrels injected in the 12 months reported through May 2025.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Iraan, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 13, 2026
- Permits on file
- 21
- Phone
- (432) 556-7325
SOURCE · RRC EWA WELLBORE SCHEDULE
- 7,931
- total depth, ft
- 2
- permits on file
- May 12, 1988
- last permit issued
- Feb 1, 2010
- completed
- 244
- cumulative oil, bbl
- 14
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 1, 2010
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wilson Sec. 44 O-10-31906 | Anna Maria (Detrital) | SBJ Oil & Gas, LLC | 1 | 244 | 14 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Vanguard Production CompanyJan 1993 → Apr 1999
- 2SBJ Oil & GasJan 2008 → Feb 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 346448-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | May 12, 1988 | May 12, 1988 | — | 8,100 |
| 336656-99 | Drill | Mobil Producing TX. & N.M. Inc. | Sep 29, 1987 | Sep 29, 1987 | Oct 7, 1987 | 8,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 1, 2010 | Wilson Sec. 44 O-10-31906 | Anna Maria (Detrital) | SBJ Oil & Gas LLC | Injection | 7,931 |
| May 11, 1988 | Wilson Sec. 44 O-10-31673 | Indian Mesa (Ellenburger) | Mobil Producing TX. & N.M. Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,459 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wolfcamp | 2,660 | -201 |
| Ellenburger | 7,615 | -5,156 |
| Ellenburger | 7,675 | -5,216 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,940 | 5,950 | Perforated |
| 6,186 | 6,208 | Perforated |
| 7,738 | 7,760 | Perforated |
| 7,834 | 7,841 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 620 | 17.5 | 1,000 S |
| 13.375 | 620 | — | — |
| 8.625 | 2,500 | 12.25 | 925 S |
| 8.625 | 2,500 | — | — |
| 5.5 | 7,931 | 7.875 | 1,850 S |
| 5.5 | 7,931 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 21, 2011 | Jan 11, 2011 | — |
| 00 | Jul 11, 1989 | Jun 20, 1989 | — |
| 00 | Sep 22, 1988 | Aug 29, 1988 | — |
| 00 | Sep 6, 1988 | — | — |
| 00 | Jun 27, 1988 | Jun 14, 1988 | — |
| 00 | Mar 15, 1988 | Feb 25, 1988 | Yes |
| 00 | Mar 7, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-35996 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-35996 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 1.6K
- bbl, last 12 reported months
- 109K
- bbl, all reported
- May 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000082516 | W-14 Disposal | Active | 1,000 | 1,000 | 5,940–5,950 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 1,600 · prior 12 1,855(-14%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37135996, documented in the API reference.