WELL · 42-371-37063 · DISTRICT 8
Neely 75 #4
Pecos County · Athey (Cherry Canyon) field · Producing · Vertical
Neely 75 #4 (API 42-371-37063) is a well in Pecos County operated by Mineral Technologies Inc., completed February 16, 2002 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued March 16, 2001, permitted to 6,000 ft.
It was permitted by Pure Resources, L.P. and has since transferred to Mineral Technologies Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Rustler, Yates, Delaware, Cherry Canyon.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Pure Resources, L.P.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Sep 4, 2025 · 12 permits on file · (432) 557-2346
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mineral Technologies Inc. |
| Production reports | Mineral Technologies, Inc.through Dec 2025 |
| Latest permit | Pure Resources, L.P.Mar 16, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 3
- permits on file
- Mar 16, 2001
- last permit issued
- Feb 16, 2002
- completed
- 0
- cumulative oil, bbl
- 479K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 16, 2002
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Neely 75 G-10-188078 | Athey (Cherry Canyon) | Mineral Technologies, Inc. | 1 | 0 | 479K | Feb 2002 – Jul 2026 |
Gas, mcf lease total
Last 12 months 487 · prior 12 2,810(-83%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pure Resources, L.P.Feb 2002 → Jan 2006
- 2Chevron Midcontinent, L.P.Apr 2006 → Apr 2010
- 3Mineral Technologies, Inc.May 2010 → Dec 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 506610-97 | Drill | Pure Resources, L.P. | Jan 15, 2002 | Mar 16, 2001 | Jan 22, 2002 | 6,000 |
| 506610-98 | Drill | Pure Resources, L.P. | Dec 18, 2001 | Mar 16, 2001 | — | 6,000 |
| 506610-99 | Drill | Pure Resources, L.P. | Mar 16, 2001 | Mar 16, 2001 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-188078 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,556 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 1,736 | 820 |
| Yates | 2,950 | -394 |
| Delaware | 4,511 | -1,955 |
| Cherry Canyon | 4,868 | -2,312 |
| Manzanita | 5,191 | -2,635 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,009 | 5,096 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,300 | 12.25 | 1,250 S |
| 4.5 | 5,753 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 2002 | Mar 1, 2002 | Yes |
| 00 | Apr 24, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-37063 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-37063 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37137063, documented in the API reference.